Lost SoulsCrown Key / Production R02

31 asset programs / District 02 / current R02

Build the places.
Choose the spaces.

Every enclosed building receives an entrance lobby and one or two purposeful furnished rooms, connected to a coherent exterior. Split and Terrace develop in parallel while Quik starts Crown Landmark.

Split Complex · first new building study
CONCEPTSplit Complex · first new building studyProposed H1 visual direction: asymmetric paired blades, one enclosed arched bridge and a low arcade base. New concept imagery; no measured shell, shared model or saved-camera alignment.Download image ↗

Design planning is authorized. The creator has expanded the program beyond shells. Room types and design values remain proposals; authored building work can proceed while site placement and actual engine checks retain their own evidence.

Five seats. Complete building packages.

Now / Crown Landmark

Support the actual build.

Preserve EXT R06 and INT R02. C02 and all81 room-fit checks are merged; resolve remaining lower-room conflicts and stage the council, diplomacy and corridor scenes.

Crown handoff →

Next / Split + Terrace

Build two packages in parallel.

Split: lobby, enclosed gallery and receiving lounge. Terrace: lobby, furnished studio and residents’ terrace lounge. Each requires a coherent editable candidate and complete handoff.

Open the five-seat plan →

Then / all families

Carry the interiors forward.

Frame Tall and Crescent Hotel follow. Every enclosed variant gets its own entrance and room fit review; pavilions, canopies and infrastructure receive usable public/service programs.

Read the atlas scene requirements →

The rollout, with exit gates.

W1

Build ahead of Quik

  • Support Crown Landmark with current C02/81-room evidence and atlas staging.
  • Develop full Split and Terrace packages concurrently; Split leads, Terrace can substitute if it passes first.

Exit evidence

  • One complete independently reviewed next-building packet; second packet approaching the same gate.

W2

Extend the working families

  • Frame Tall and Crescent Hotel next; Long Arcade and reusable arrival/room components follow.

Exit evidence

  • Two queued build-ready packages maintained; lessons from Quik incorporated.

W3

Complete all variants

  • Twist, Garden, office, residence and Straight families; mid/compact/curved/corner variants receive individual fit review.

Exit evidence

  • Every enclosed variant has its lobby and selected rooms with coherent access and evidence.

W4

Public realm and connections

  • Pavilions, canopies, bridges, seawall and docks develop access/use programs alongside their building interfaces.

Exit evidence

  • Connection and site interfaces resolved in the shared world frame; no invented geography.

25 building variants + 6 structures

Every asset has a boundary.

Filter by wave, family or proposed scope. Open an asset to inspect its reachable spaces, exclusions, reuse, era-specific use and completion criteria.

31 of 31 asset scopes

PI-BLD-0001-V01 · W1

Crown Landmark

Preserve existing story sliceSupport Quik’s Crown Landmark start with existing exterior/interior work, resolved selected-room fit, and atlas scene staging.

Primary district landmark; preserve EXT R06 identity while resolving shell fit.

Reachable space / design boundary

  • Existing ground arrival lobby and core route
  • Existing L25 council / vote, waiting, celebration and corridor suite
  • Existing L26 diplomacy / private lounge, breakfast, office and records suite

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Resolve C02 late-taper silhouette tradeoff, five lower allowance conflicts and L03-RM001/Rib_R1 intrusion with the exact chosen model; preserve C01/C02 provenance.
  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

EXT R06 and INT R02 retained. C02 and all81 room-fit measurements merged in PR45. C02:75 fit,5 below proposed1.2m allowance,1 outside wall/deck; all32 upper rooms fit. Shell choice, lower conflicts and actual engine evidence remain open.

Story placement: proposed; not approved

Prior register tier E is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0002-V01 · W1

Split Complex

Lobby + purposeful roomsDesign a usable Split Complex with Arrival lobby and core landing, Enclosed bridge gallery, Receiving lounge / overlook, furnishings and connected access.

Distinctive paired-tower and bridge silhouette; first new building study chosen by the creator.

Reachable space / design boundary

  • Arrival lobby and core landing
  • Enclosed bridge gallery
  • Receiving lounge / overlook
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • Preferred H1 roof planting is scenic; roof access or a second bridge level requires a deliberate design change.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Resolve newer H1 one enclosed bridge versus older CB00 two-bridge template before entering dimensions. Preserve the alternative; author one coherent selected contract.
  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Four R01 concepts (exterior, bridge, lobby, gallery), source research and H1 route; older Candidate B technical skeleton conflicts on bridge count. No complete authored building model or build-ready packet evidenced.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0003-V01 · W1

Terrace Tower

Lobby + purposeful roomsDesign a usable Terrace Tower with Residential arrival lobby, Furnished studio sample, Residents’ terrace lounge, furnishings and connected access.

Distinctive stepped terrace silhouette; retain its existing concept as a future study input.

Reachable space / design boundary

  • Residential arrival lobby
  • Furnished studio sample
  • Residents’ terrace lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Existing source research and Concept A; a further full-building concept was generated in this session. Core, setbacks, reverse side and measured connected interior package still need authoring.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0004-V01 · W3

Twist Tall

Lobby + purposeful roomsDesign a usable Twist Tall with Sculptural entrance lobby, Private office, Meeting lounge, furnishings and connected access.

Twisting tall skyline silhouette.

Reachable space / design boundary

  • Sculptural entrance lobby
  • Private office
  • Meeting lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0004-V02 · W3

Twist Compact

Lobby + purposeful roomsDesign a usable Twist Compact with Sculptural entrance lobby, Private office, Meeting lounge, furnishings and connected access.

Compact twisting silhouette.

Reachable space / design boundary

  • Sculptural entrance lobby
  • Private office
  • Meeting lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0005-V01 · W3

Garden Canyon

Lobby + purposeful roomsDesign a usable Garden Canyon with Garden-facing arrival lobby, Furnished studio sample, Shared garden lounge, furnishings and connected access.

Garden-canyon void and planted massing.

Reachable space / design boundary

  • Garden-facing arrival lobby
  • Furnished studio sample
  • Shared garden lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0005-V02 · W3

Terraced Garden

Lobby + purposeful roomsDesign a usable Terraced Garden with Garden-facing arrival lobby, Furnished studio sample, Shared garden lounge, furnishings and connected access.

Terraced garden silhouette and landscape layers.

Reachable space / design boundary

  • Garden-facing arrival lobby
  • Furnished studio sample
  • Shared garden lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0006-V01 · W2

Frame Tall

Lobby + purposeful roomsDesign a usable Frame Tall with Lobby revealing the exoframe / core, Private office, Meeting room, furnishings and connected access.

Tall exoframe skyline rhythm.

Reachable space / design boundary

  • Lobby revealing the exoframe / core
  • Private office
  • Meeting room
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0006-V02 · W3

Frame Mid

Lobby + purposeful roomsDesign a usable Frame Mid with Lobby revealing the exoframe / core, Private office, Meeting room, furnishings and connected access.

Mid-height exoframe rhythm.

Reachable space / design boundary

  • Lobby revealing the exoframe / core
  • Private office
  • Meeting room
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0006-V03 · W3

Frame Compact

Lobby + purposeful roomsDesign a usable Frame Compact with Lobby revealing the exoframe / core, Private office, Meeting room, furnishings and connected access.

Compact exoframe streetscape mass.

Reachable space / design boundary

  • Lobby revealing the exoframe / core
  • Private office
  • Meeting room
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0007-V01 · W3

Courtyard Offices

Lobby + purposeful roomsDesign a usable Courtyard Offices with Reception and waiting lobby, Office / workspace sample, Conference room, furnishings and connected access.

Courtyard frontage and office-scale enclosure.

Reachable space / design boundary

  • Reception and waiting lobby
  • Office / workspace sample
  • Conference room
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0007-V02 · W3

Glass Office Block

Lobby + purposeful roomsDesign a usable Glass Office Block with Reception and waiting lobby, Office / workspace sample, Conference room, furnishings and connected access.

Transparent office-block frontage.

Reachable space / design boundary

  • Reception and waiting lobby
  • Office / workspace sample
  • Conference room
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0008-V01 · W3

Stepped Residences

Lobby + purposeful roomsDesign a usable Stepped Residences with Residential entrance lobby, Furnished studio sample, Residents’ lounge, furnishings and connected access.

Stepped residential-looking mass and balconies.

Reachable space / design boundary

  • Residential entrance lobby
  • Furnished studio sample
  • Residents’ lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0008-V02 · W3

Compact Residences

Lobby + purposeful roomsDesign a usable Compact Residences with Residential entrance lobby, Furnished studio sample, Residents’ lounge, furnishings and connected access.

Compact residential-looking mass.

Reachable space / design boundary

  • Residential entrance lobby
  • Furnished studio sample
  • Residents’ lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0009-V01 · W2

Crescent Hotel

Lobby + purposeful roomsDesign a usable Crescent Hotel with Reception and waiting lobby, Furnished guest room, Hospitality / terrace lounge, furnishings and connected access.

Crescent hospitality-compatible landmark.

Reachable space / design boundary

  • Reception and waiting lobby
  • Furnished guest room
  • Hospitality / terrace lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier D is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0009-V02 · W3

Compact Terrace Block

Lobby + purposeful roomsDesign a usable Compact Terrace Block with Reception and waiting lobby, Furnished guest room, Hospitality / terrace lounge, furnishings and connected access.

Compact terrace hospitality-compatible mass.

Reachable space / design boundary

  • Reception and waiting lobby
  • Furnished guest room
  • Hospitality / terrace lounge
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier D is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0010-V01 · W2

Long Arcade

Lobby + purposeful roomsDesign a usable Long Arcade with Covered arrival and enclosed shop vestibule, Shop or cafe bay, Back room / service space, furnishings and connected access.

Long waterfront/covered-passage frontage and repeat-bay rhythm.

Reachable space / design boundary

  • Covered arrival and enclosed shop vestibule
  • Shop or cafe bay
  • Back room / service space
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier B is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0010-V02 · W3

Curved Arcade

Lobby + purposeful roomsDesign a usable Curved Arcade with Covered arrival and enclosed shop vestibule, Shop or cafe bay, Back room / service space, furnishings and connected access.

Curved covered-passage frontage.

Reachable space / design boundary

  • Covered arrival and enclosed shop vestibule
  • Shop or cafe bay
  • Back room / service space
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier B is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0010-V03 · W3

Corner Arcade

Lobby + purposeful roomsDesign a usable Corner Arcade with Covered arrival and enclosed shop vestibule, Shop or cafe bay, Back room / service space, furnishings and connected access.

Corner arcade and turning frontage.

Reachable space / design boundary

  • Covered arrival and enclosed shop vestibule
  • Shop or cafe bay
  • Back room / service space
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier B is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0011-V01 · W4

Waterfront Pavilion

Complete open-space programGive Waterfront Pavilion a complete arrival, use and service program suited to open architecture.

Waterfront open shelter and view pause.

Reachable space / design boundary

  • Sheltered arrival / orientation
  • Usable lounge or kiosk area
  • Service/store room only where enclosure is intended
  • Continuous accessible public route and explicit service boundary.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No artificial enclosed lobby or unnecessary second room.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier B is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0011-V02 · W4

Inner Pavilion

Complete open-space programGive Inner Pavilion a complete arrival, use and service program suited to open architecture.

Inner open shelter and route pause.

Reachable space / design boundary

  • Sheltered arrival / orientation
  • Usable lounge or kiosk area
  • Service/store room only where enclosure is intended
  • Continuous accessible public route and explicit service boundary.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No artificial enclosed lobby or unnecessary second room.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier B is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0012-V01 · W4

West Arrival Canopy

Complete open-space programGive West Arrival Canopy a complete arrival, use and service program suited to open architecture.

West arrival shelter and circulation marker.

Reachable space / design boundary

  • Open arrival concourse
  • Information / control point
  • Support enclosure only when operations require it
  • Continuous accessible public route and explicit service boundary.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No artificial enclosed lobby or unnecessary second room.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier A is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0012-V02 · W4

East Arrival Canopy

Complete open-space programGive East Arrival Canopy a complete arrival, use and service program suited to open architecture.

East arrival shelter and circulation marker.

Reachable space / design boundary

  • Open arrival concourse
  • Information / control point
  • Support enclosure only when operations require it
  • Continuous accessible public route and explicit service boundary.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No artificial enclosed lobby or unnecessary second room.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier A is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0013-V01 · W3

Straight Tall

Lobby + purposeful roomsDesign a usable Straight Tall with Reception and entrance lobby, Office / workspace sample, Meeting room, furnishings and connected access.

Tall straight skyline mass.

Reachable space / design boundary

  • Reception and entrance lobby
  • Office / workspace sample
  • Meeting room
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-BLD-0013-V02 · W3

Straight Slim

Lobby + purposeful roomsDesign a usable Straight Slim with Reception and entrance lobby, Office / workspace sample, Meeting room, furnishings and connected access.

Slim straight skyline mass.

Reachable space / design boundary

  • Reception and entrance lobby
  • Office / workspace sample
  • Meeting room
  • Continuous entrance → lobby → core/threshold → selected rooms → return/exit route.

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Exterior hero, reverse side, entrance and defining detail; two useful views of the lobby and each selected room. Use existing suitable imagery; record genuine gaps.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier C is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-STR-0001-V01 · W4

Bridge Span

Outdoor route onlyComplete Bridge Span with usable access, materials, clearances and coordinated building / waterfront interfaces.

Bridge connection silhouette and deck interface.

Reachable space / design boundary

  • Continuous public access through the authored structure
  • Defined service / restricted boundary and adjoining asset connection

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No lobby requirement for infrastructure.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.
  • Reconcile site frame, water datum, route width/clearance and connections without changing the approved geography by inference.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier A is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-STR-0002-V01 · W4

Bridge Landing

Outdoor route onlyComplete Bridge Landing with usable access, materials, clearances and coordinated building / waterfront interfaces.

Bridge landing and change of grade.

Reachable space / design boundary

  • Continuous public access through the authored structure
  • Defined service / restricted boundary and adjoining asset connection

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No lobby requirement for infrastructure.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.
  • Reconcile site frame, water datum, route width/clearance and connections without changing the approved geography by inference.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier A is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-STR-0003-V01 · W4

Seawall and Promenade

Outdoor route onlyComplete Seawall and Promenade with usable access, materials, clearances and coordinated building / waterfront interfaces.

Waterfront edge and continuous public frontage.

Reachable space / design boundary

  • Continuous public access through the authored structure
  • Defined service / restricted boundary and adjoining asset connection

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No lobby requirement for infrastructure.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.
  • Reconcile site frame, water datum, route width/clearance and connections without changing the approved geography by inference.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier A is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-STR-0004-V01 · W4

Finger Dock

Outdoor route onlyComplete Finger Dock with usable access, materials, clearances and coordinated building / waterfront interfaces.

Marina edge and mooring character.

Reachable space / design boundary

  • Continuous public access through the authored structure
  • Defined service / restricted boundary and adjoining asset connection

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No lobby requirement for infrastructure.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.
  • Reconcile site frame, water datum, route width/clearance and connections without changing the approved geography by inference.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier A is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-STR-0005-V01 · W4

Dock Connection

Outdoor route onlyComplete Dock Connection with usable access, materials, clearances and coordinated building / waterfront interfaces.

Shore-to-dock transition.

Reachable space / design boundary

  • Continuous public access through the authored structure
  • Defined service / restricted boundary and adjoining asset connection

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No lobby requirement for infrastructure.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.
  • Reconcile site frame, water datum, route width/clearance and connections without changing the approved geography by inference.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier A is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

PI-STR-0006-V01 · W4

Arcade Bay Module

Reusable exterior moduleComplete Arcade Bay Module with usable access, materials, clearances and coordinated building / waterfront interfaces.

Repeated arcade column/canopy and frontage rhythm.

Reachable space / design boundary

  • Continuous public access through the authored structure
  • Defined service / restricted boundary and adjoining asset connection

Excluded or deferred

  • Unselected upper floors and inaccessible areas remain bounded; a playable sample does not commission every floor.
  • Final placement/world scale and engine acceptance require their own evidence.
  • No lobby requirement for infrastructure.

Reuse strategy

  • Share compatible doors, core components, finish palettes and props; check actual room and envelope fit per variant.
  • Preserve this asset’s distinguishing silhouette, entry and material identity.

Complete when

  • Design intent: controlling reference hierarchy, discrepancies, selected room program and exterior identity recorded.
  • Single proposed dimension contract with essential envelope, floor, opening, core and interface values complete; values remain labeled proposed until reviewed.
  • Editable blockout plus derived room plans, sections, elevations, level schedule and saved cameras agree with the contract.
  • Furnished access route, doors, windows, stairs/lift approach, materials and props fit the authored layout; inaccessible areas are explicit.
  • Independent reviewer checks geometry, image continuity, usable route, manifests and the package issue gate. Essential unknowns prevent build-ready status.
  • Quik receives versioned files, hashes, build order, import settings and a short list of residual nonblocking choices. Actual engine import/traversal/performance evidence is recorded separately.
  • Reconcile site frame, water datum, route width/clearance and connections without changing the approved geography by inference.

2043 · selected story period

Controlled invited cohort and staff use. Occupancy, resident identities and story assignments stay explicit; no dense population inferred.

2045 · later growth

Room/component kits may support later growth after variant fit review; no numeric population or new story assignment is implied.

Existing evidence

Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Story placement: no named story assignment; optional world-life program

Prior register tier A is an existing proposal, not the selected space scope. Engine acceptance: not evidenced by the audited records.

What “complete” must establish.

Building R05 tier meanings stay unchanged: A Exterior only · B Small enterable space · C Reusable interior kit · D Gameplay building · E Major story landmark. A prior register tier is not an instruction to open a whole building.

Sources and handoff.

Readable by the team and their AIs.

The scope record carries all 31 decisions. The R01 delivery audit and story basis remain dated history. The current R02 atlas audit and five-seat plan define the new work without inventing canon. Full source-image provenance and the page map are in the Crown Key image library.

Unlisted production planning · public to anyone with the link · noindex. Baseline 4ce28d89b6fb; recheck main and pending branches before execution.