New exterior candidate · R01
Open the model and drawings.
Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.
Exterior package and downloads →Draft production prep · R01 · 16 October 2026
Dock Connection
Prepare a detached dock-to-shore connection study; do not assign tide, hinge, slope, waterline or endpoints.
Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.
Current production program · R02
Exterior, usable spaces and a complete handoff.
Complete Dock Connection with usable access, materials, clearances and coordinated building / waterfront interfaces.
Required spaces
- Continuous public access through the authored structure
- Defined service / restricted boundary and adjoining asset connection
Required exterior coverage
- Overall usable route
- Interface close-up
- User-eye approach / exit
- Section or clearance review from authored model
Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.
Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.
Owner: OA1 / assign after first packages · Independent reviewer: OA1-assigned independent read-only reviewer
Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs
R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.
Prepare now
- Prepare detached gangway/head-block with fixed/hinged alternatives.
- Draft slope/clearance section with missing inputs blank.

Preparation / not geometry
What Quik will build and review.
Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.
- 01Inclined gangwaysource notes
- 02Truss railssource notes
- 03Stone head blocksource notes
- 04Dock transition postssource notes
- 05Route/clearance rolesource record
Modeling sequence
- 01Classify routeOwner identifies function/endpoints.
- 02Block jointFixed/hinged/tide options named, not selected.
- 03Check gradeMeasured path review follows endpoint selection.
- 04Check clearanceNo 20 m pass until datum selected.
- 05Package interfacesNo tide simulation/collision/placement claim.
Planned review views
Components & scope evidence
Scope basis: Card shows a trussed gangway between stone head block and timber dock but does not show joint behavior or identify whether it is the creator's switchback ramp. Boat-clearance datum is open.
| Component | Role and evidence | Open questions |
|---|---|---|
| Inclined gangway | Plank/grated deck between shore block and dock. source_notes |
|
| Truss rails | Thin metal rails with diagonal members. source_notes |
|
| Stone head block | Pale upper block with short rail/lamp. source_notes |
|
| Dock transition posts | Gold-collared posts at transition/upper block. source_notes |
|
| Route/clearance role | Card doesn't link gangway to switchbacks or 20 m clearance. source_record |
|
Modeling sequence & review views
Classify route
Keep gangway distinct from switchback requirement until confirmed.
Gate: Owner identifies function/endpoints.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Block joint
Separate head, gangway, truss, lower end and posts.
Gate: Fixed/hinged/tide options named, not selected.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Check grade
Leave slope/landing fields blank until accessibility inputs exist.
Gate: Measured path review follows endpoint selection.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Check clearance
Show boat relation with datum unresolved.
Gate: No 20 m pass until datum selected.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Package interfaces
Return detached end details and connection schedule.
Gate: No tide simulation/collision/placement claim.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Required review views
Gangway plan
Show deck, rails and both ends without dimensions.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Longitudinal section
Show movement options and datum unresolved.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Upper block detail
Show stone block and shore connection.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Dock-end detail
Show truss and lower attachment.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Shared kits & asset dependencies
Candidate kits
Proposed dependencies
- PI-STR-0003-V01: Candidate upper attachment; type/datum unknown. (proposed)
- PI-STR-0004-V01: Candidate lower attachment; support/deck height unknown. (proposed)
Decision queue & Friday return
Is joint fixed, hinged or tide-following?
Owner: Quik. Resolution evidence: Selected detail and operating envelope.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/ASSET_BRIEF.json
- production/assets/structures/PI-STR-0005-V01/BUILDING_DIMENSIONS.json
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Is this distinct from switchback ramp?
Owner: Legend + Quik. Resolution evidence: Named route/function decision in connection spec.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/ASSET_BRIEF.json
- production/assets/structures/PI-STR-0005-V01/BUILDING_DIMENSIONS.json
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Where do ends attach and what accessibility criteria apply?
Owner: Legend + Quik. Resolution evidence: Endpoint IDs, datum and measured section.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/ASSET_BRIEF.json
- production/assets/structures/PI-STR-0005-V01/BUILDING_DIMENSIONS.json
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Does joint affect 20 m boat clearance?
Owner: Legend + Quik. Resolution evidence: Water/boat section with explicit datum.
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/ASSET_BRIEF.json
- production/assets/structures/PI-STR-0005-V01/BUILDING_DIMENSIONS.json
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
Friday: requires decision
- Route purpose, endpoints, movement type, datum and accessibility.
- Switchback relationship and 20 m applicability.
Friday: return evidence
- Editable detached joint and connector spec.
- Plan, longitudinal section and end details without placement.
- Decision record separating observation from route requirement.
Downloads & source inventory
README and JSON retain repository-relative source paths. Use the linked inventory here when reviewing downloaded copies.
Source inventory
- docs/current-decisions.md
- production/assets/structures/PI-STR-0005-V01/ASSET_BRIEF.json
- production/assets/structures/PI-STR-0005-V01/BUILDING_DIMENSIONS.json
- production/assets/structures/PI-STR-0005-V01/REFERENCE_INDEX.csv
- production/assets/structures/PI-STR-0005-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.json
- production/districts/D02-CrownKey/planning/prep/R01/ASSET_INPUTS_B.json
- production/districts/D02-CrownKey/planning/prep/R01/KIT_CATALOG.json
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/building/R05/README.md
- production/protocols/current.json
- production/protocols/district/R04/templates/CONNECTIONS.json
- production/protocols/district/R05/README.md
- production/workflows/spatial-imagery/R01/GUIDE.md