Lost SoulsCrown Key / preparation

New exterior candidate · R01

Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

Dock Connection

Prepare a detached dock-to-shore connection study; do not assign tide, hinge, slope, waterline or endpoints.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Complete Dock Connection with usable access, materials, clearances and coordinated building / waterfront interfaces.

Required spaces

Required exterior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA1 / assign after first packages · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-STR-0005-V01P1structureunset

Prepare now

Open source concept image ↗Dock Connection concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Classify routeOwner identifies function/endpoints.
  2. 02Block jointFixed/hinged/tide options named, not selected.
  3. 03Check gradeMeasured path review follows endpoint selection.
  4. 04Check clearanceNo 20 m pass until datum selected.
  5. 05Package interfacesNo tide simulation/collision/placement claim.

Planned review views

Components & scope evidence

Scope basis: Card shows a trussed gangway between stone head block and timber dock but does not show joint behavior or identify whether it is the creator's switchback ramp. Boat-clearance datum is open.

ComponentRole and evidenceOpen questions
Inclined gangwayPlank/grated deck between shore block and dock.
source_notes
  • Is it fixed/tide-following and what slope/landing inputs apply?
Truss railsThin metal rails with diagonal members.
source_notes
  • What rail/collision/accessibility treatment is selected?
Stone head blockPale upper block with short rail/lamp.
source_notes
  • Does upper end attach to seawall, promenade or landing?
Dock transition postsGold-collared posts at transition/upper block.
source_notes
  • Are posts supports, bollards or visual markers?
Route/clearance roleCard doesn't link gangway to switchbacks or 20 m clearance.
source_record
  • Is it separate from switchback ramp and does it affect boat envelope?
Modeling sequence & review views
  1. Classify route

    Keep gangway distinct from switchback requirement until confirmed.

    Gate: Owner identifies function/endpoints.

  2. Block joint

    Separate head, gangway, truss, lower end and posts.

    Gate: Fixed/hinged/tide options named, not selected.

  3. Check grade

    Leave slope/landing fields blank until accessibility inputs exist.

    Gate: Measured path review follows endpoint selection.

  4. Check clearance

    Show boat relation with datum unresolved.

    Gate: No 20 m pass until datum selected.

  5. Package interfaces

    Return detached end details and connection schedule.

    Gate: No tide simulation/collision/placement claim.

Required review views

Gangway plan

Show deck, rails and both ends without dimensions.

Longitudinal section

Show movement options and datum unresolved.

Upper block detail

Show stone block and shore connection.

Dock-end detail

Show truss and lower attachment.

Shared kits & asset dependencies
Decision queue & Friday return

Is joint fixed, hinged or tide-following?

Owner: Quik. Resolution evidence: Selected detail and operating envelope.

Is this distinct from switchback ramp?

Owner: Legend + Quik. Resolution evidence: Named route/function decision in connection spec.

Where do ends attach and what accessibility criteria apply?

Owner: Legend + Quik. Resolution evidence: Endpoint IDs, datum and measured section.

Does joint affect 20 m boat clearance?

Owner: Legend + Quik. Resolution evidence: Water/boat section with explicit datum.

Friday: requires decision

  • Route purpose, endpoints, movement type, datum and accessibility.
  • Switchback relationship and 20 m applicability.

Friday: return evidence

  • Editable detached joint and connector spec.
  • Plan, longitudinal section and end details without placement.
  • Decision record separating observation from route requirement.