Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

Compact Terrace Block

Prepare a separate P1 Tier D compact hotel/terrace candidate only if its proposed hotel use is confirmed; do not scale Crescent Hotel down.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Design a usable Compact Terrace Block with Reception and waiting lobby, Furnished guest room, Hospitality / terrace lounge, furnishings and connected access.

Required spaces

Required exterior coverage

Required interior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA2 (proposed seat assignment) · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-BLD-0009-V02P1buildingunset

Prepare now

Open source concept image ↗Compact Terrace Block concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Confirm use statusNo hotel interior treated as approved until use selected.
  2. 02Block two tiersSame-model plan/axon exposes envelope questions.
  3. 03Resolve arch functionEntry choice precedes route design.
  4. 04Fit if selectedNo V01 dimensions carry over.
  5. 05Package roof/routeUse status remains visible.

Planned review views

Components & scope evidence

Scope basis: Register says V02 use remains proposed and requires a separate envelope test. Notes show a low roughly rectangular two-tier block with arched base, setback upper volume and pool; V01 is long, curved and multi-storey.

ComponentRole and evidenceOpen questions
Two-tier compact shellBroad lower level and smaller rounded upper volume set back to form terrace.
source_notes
  • What are rear faces, setbacks, footprint and guest-floor count?
Rounded-arch baseRound-topped bays; open passage vs glazed bay is unresolved.
source_notes
  • Which arches are doors, walkways or glazing; do they continue around?
Terrace/roof poolGlass-railed terrace, roof pool and small roof box.
source_notes
  • How is roof reached and what pool edge/safety applies?
Conditional hotel roomsGuest/public program applies only if V02 hotel use is selected.
source_record
  • Is V02 a hotel and which Tier D rooms are required?
Service/loading routeLaundry/loading route if proposed hotel use is retained.
source_record
  • Where is loading and how is it separated from guests?
Modeling sequence & review views
  1. Confirm use status

    Keep V02 hotel use proposed while recording compact two-tier form.

    Gate: No hotel interior treated as approved until use selected.

  2. Block two tiers

    Separate lower arches, upper setback, terrace and pool.

    Gate: Same-model plan/axon exposes envelope questions.

  3. Resolve arch function

    Diagram open/glazed/entry alternatives without committing doors.

    Gate: Entry choice precedes route design.

  4. Fit if selected

    If hotel use is confirmed, fit sample guest/public/service spaces to measured V02.

    Gate: No V01 dimensions carry over.

  5. Package roof/route

    Return roof plan, section and routes if selected.

    Gate: Use status remains visible.

Required review views

Front two-tier axon

Show arched base and upper setback.

Roof/terrace plan

Show pool and terrace; roof access remains open if undecided.

Arch/setback section

Show base opening and upper tier without guessed dimensions.

Conditional guest/service route

Show routes only if hotel use is confirmed.

Shared kits & asset dependencies
Decision queue & Friday return

Is V02 a hotel or separate compact-block use?

Owner: Legend. Resolution evidence: Use/era/enterability decision in asset brief.

Which arches are open/glazed/entry, and what is front?

Owner: Legend. Resolution evidence: Selected view, ground plan and access route.

How many guest levels and how is roof reached?

Owner: Legend + Quik. Resolution evidence: Measured section and core/roof access plan.

Can V01 hotel kits fit V02 without geometry changes?

Owner: Quik. Resolution evidence: Independent fit comparison; no automatic reuse.

Friday: requires decision

  • V02 use, enterability, front/entry and arch function.
  • Measured V02 envelope/core before adapting hotel kit.

Friday: return evidence

  • Separate V02 blockout with no V01 geometry inheritance.
  • Roof plan, arch section and conditional route.
  • Kit-fit comparison with unproven parts identified.