# Start here — Crown Key R02

Goal: Quik builds Crown Landmark while the team finishes the next building package, then maintains two build-ready packages ahead of him. Current verified next-building buffer: **0**.

Creator direction supersedes R01's shell-only/deferred-interior recommendation: all enclosed Crown Key buildings receive a lobby/arrival plus one or two useful rooms. Preserve Crown Landmark's larger issued interior program. Treat outdoor structures according to actual use. Audit atlas scene requirements before claiming scene coverage.

Read in this order:

1. Current `AGENTS.md`, `docs/current-decisions.md`, `production/protocols/current.json` from `215GrandAve/lost-souls` main; record your actual base SHA. This plan's baseline is `4ce28d89b6fb1922f0b8427937b986961504307d`.
2. [README.md](https://thelostsouls.world/CrownKey/production/plan/README.md), especially readiness states and path ownership.
3. Your matching brief: [OA1](https://thelostsouls.world/CrownKey/production/plan/seats/OA1.md), [OA2](https://thelostsouls.world/CrownKey/production/plan/seats/OA2.md), [OA3](https://thelostsouls.world/CrownKey/production/plan/seats/OA3.md), [CLAUDE1](https://thelostsouls.world/CrownKey/production/plan/seats/CLAUDE1.md), [CLAUDE2](https://thelostsouls.world/CrownKey/production/plan/seats/CLAUDE2.md).
4. [Active production run · candidate packages, images, blueprints and materials](https://thelostsouls.world/CrownKey/production/run/) and [uploaded source register · 37 files and current links](https://thelostsouls.world/CrownKey/production/plan/SOURCE_REGISTER.md).
5. [Current atlas scene audit](https://thelostsouls.world/CrownKey/production/plan/atlas/), [all31 functional programs](https://thelostsouls.world/CrownKey/production/plan/DEVELOPMENT_SCOPE.json), your asset's issued references/dimension contract, R01 coverage, and relevant merged tool/candidate sources.

Facts to preserve: PR #45 C02/81-room work is merged at `a7220db`; PR #51 tooling is merged at `7a81eb8`. Neither merge establishes new engine acceptance. Split CB00's two bridges conflict with H1's single bridge: resolve the topology before adapting the candidate.

Launch OA2, OA3 and CLAUDE1 with their matching briefs. Each new seat's first response to OA1 must contain: `seat | branch | base SHA | exact claimed paths | first deliverable | blocker`. These new claims are proposed, not evidence of already running external seats; use separate branches/worktrees. Give Quik's already assigned Claude the CLAUDE2 coordination addendum and preserve its current execution session, branch and existing feedback path. No restart or new review branch is required.

OA1 is the only integrator and shared-site publisher. OA1 owns `docs/crown-key-production/R02/reviews/` and delegates independent geometry, route and package release checks to read-only reviewers, using Astra for bounded difficult reviews. CLAUDE1 owns its initial `claude-tooling/` lane. CLAUDE2 continues fixture/sample/Crown execution and contributes incoming-package or engine feedback as available; its availability is not a required next-building release gate.

First production order: Split Complex, Terrace Tower in parallel as fallback, then Frame Tall and Crescent Hotel. Atlas-supported urgency may reorder the later queue. Do not start every family at once. Do not overwrite issued sources, invent approved dimensions, move scenes between districts without evidence, or label concepts as finished models.

Report evidence, not percentages: actual files, current readiness state, unresolved blocker and next deliverable. Keep design-ready, build-ready and engine-verified separate. Quik's Crown work can proceed; placement/frame/site decisions are tracked separately.
