Lost SoulsCrown Key / preparation

New exterior candidate · R01

Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

Twist Tall

Prepare the Twist Tall variant-specific envelope/core/facade questions and a single typical rotated-floor kit candidate.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Design a usable Twist Tall with Sculptural entrance lobby, Private office, Meeting lounge, furnishings and connected access.

Required spaces

Required exterior coverage

Required interior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA3 (proposed seat assignment) · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-BLD-0004-V01P2buildingunset

Prepare now

Open source concept image ↗Twist Tall concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Keep braid/deck conflict openLegend review is required before ribbon geometry or walkability is modeled.
  2. 02Document rotation and coreRotation values and levels remain unset until authored source evidence supports them.
  3. 03Fit one typical room kitUsable clear dimensions require a sourced plan and reviewed character/camera assumptions.
  4. 04Prepare variant-specific shell viewsUse views to compare geometry; do not infer measurements from perspective.
  5. 05Return open decisionsNo shell or room kit is accepted by this prep record.

Planned review views

Components & scope evidence

Scope basis: P2; proposed Tier C. Catalog concept only; no dedicated pack, placement, shell revision or engine evidence. The register says Tall and Compact are distinct envelopes; proposed program is lobby plus one typical rotated-floor office/residential kit.

ComponentRole and evidenceOpen questions
Rotated floor expressionTall variant: document the rotation sequence and stable-core relationship across the taller expression; do not infer a floor count from the name. The register requires the floor rotation to be documented.
source_record
  • What is the rotation sequence and which reference controls each transition?
Stable service coreThe register requires a stable core to be documented alongside the rotation.
source_record
  • Does the core remain fixed through the sequence, and how do stairs/lifts/services connect?
Facade-to-room fitThe register identifies facade-to-room fit as a family-specific test.
source_record
  • How do windows/openings align with usable room zones on rotated floors?
Usable corner spaceCorner-space usability is explicitly called out; no room dimensions are supplied.
source_record
  • Which corner conditions remain usable after structure, facade and furniture are accounted for?
Typical office/residential floorA single reusable typical-floor kit is proposed for review, not approved.
source_record
  • Which use and room arrangement anchors the first kit?
Tall spiral ribbons and cylindrical glass bodyNotes describe a slender cylindrical glass body wrapped by cream spiral ribbons. The card reads as braided/crossing ribbons while the location render reads as parallel decks; ribbon depth, support, front and terminations remain unresolved.
source_notes
  • Are ribbons crossing or parallel, and which reference controls?
  • Are they walkable balconies, and where do they start/end?
Modeling sequence & review views
  1. Keep braid/deck conflict open

    Use the notes/index to document the crossing-card versus parallel-deck-render readings; prepare a path/termination diagram without choosing geometry.

    Gate: Legend review is required before ribbon geometry or walkability is modeled.

  2. Document rotation and core

    Create a floor-to-floor relationship diagram for rotation, core continuity, and facade orientation.

    Gate: Rotation values and levels remain unset until authored source evidence supports them.

  3. Fit one typical room kit

    Place only a schematic office/residential kit against the candidate rotated floor and flag facade/corner conflicts.

    Gate: Usable clear dimensions require a sourced plan and reviewed character/camera assumptions.

  4. Prepare variant-specific shell views

    Request matching front, top/typical-floor and vertical-section views for this asset and its sibling.

    Gate: Use views to compare geometry; do not infer measurements from perspective.

  5. Return open decisions

    List envelope, rotation, stable-core and interior-kit questions with evidence needed to resolve each.

    Gate: No shell or room kit is accepted by this prep record.

Required review views

Twist Tall front/three-quarter view

Resolve the card’s braided ribbon reading against the render’s parallel spiral-deck reading from selected authority.

Typical-floor plan from above

Show the rotated facade, core, room zones and corner usability.

Vertical core/facade section

Test whether the core remains stable while the floor/facade expression changes.

Typical-room/player-height view

Reveal usable corners, opening placement and camera sightline after the room kit is selected.

Shared kits & asset dependencies

Candidate kits

Proposed dependencies

Decision queue & Friday return

Are the Tall ribbons a crossing braid or stacked spiral decks, and are they walkable around the tower?

Owner: Legend. Resolution evidence: Named reference authority, annotated ribbon path, and selected balcony enterability.

Which typical office/residential layout is selected, and which corner zones are usable?

Owner: Legend. Resolution evidence: Representative furnished plan with door, structure, furniture, camera and access checks.

Which differences from PI-BLD-0004-V02 require distinct geometry or a separate shell revision?

Owner: Legend. Resolution evidence: Side-by-side reference comparison and an explicit reuse/geometry-change record.

What levels, core vertical connections and openings must be verified before shell approval?

Owner: Quik with design/layout author. Resolution evidence: Measured shell and core/clearance evidence from the actual candidate, reviewed against the accepted dimension contract.

Friday: requires decision

  • Legend selection of controlling references and the variant geometry differences to preserve.
  • Reviewed rotation/core/floor schedule and chosen interior scope before producing a dimensioned shell or room kit.

Friday: return evidence

  • Variant comparison showing Twist Tall separately from PI-BLD-0004-V02, with source provenance.
  • Dimensioned typical-floor and section proposal with statuses, open items, and candidate camera/player clearance tests.
Downloads & source inventory