New exterior candidate · R01

Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

Seawall and Promenade

Prepare an unplaced shoreline section library distinguishing promenade wall from rocky/boulder options; hold datum and segment selection.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Complete Seawall and Promenade with usable access, materials, clearances and coordinated building / waterfront interfaces.

Required spaces

Required exterior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA1 / assign after first packages · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-STR-0003-V01P1structureunset

Prepare now

Open source concept image ↗Seawall and Promenade concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Separate typologiesLegend assigns types after master review.
  2. 02Set datum fieldsDatum named before dimensioned section.
  3. 03Block edge partsNo detail baked into every shore segment.
  4. 04Check neighbor jointsR04 connection review resolves interfaces.
  5. 05Package sectionsRespect foundation reset and construction hold.

Planned review views

Components & scope evidence

Scope basis: Notes conflict between recessed wall, plain promenade edge/bollards and rocky shoreline. Foundation reset replaces freestyled coast; no one section is approved for every segment.

ComponentRole and evidenceOpen questions
Promenade surfacePale tiled walk with curved cut-outs/edge variations.
source_notes
  • What clear width, level and accessible transition apply?
Recessed wallWeathered base, waterline band and shallow lit arches.
source_notes
  • Is recessed wall standard or segment-specific?
Rock/boulder edgeAerials show boulders west/northwest unlike quay-like render.
source_notes
  • Which segments use boulders and are rocks separate assets?
Bollard/rail edgeRender has gold-banded bollards; card has glass/metal rail/lamp.
source_notes
  • Which safety/boat interface applies by shore segment?
Datum/jointsWater/tide datum and dock/landing joins are open.
source_record
  • What datum governs wall/dock and relevant boat-clearance route?
Modeling sequence & review views
  1. Separate typologies

    Compare recessed wall, plain promenade, rocky edge; do not make one standard.

    Gate: Legend assigns types after master review.

  2. Set datum fields

    Keep water/tide and wall-top null until resolved.

    Gate: Datum named before dimensioned section.

  3. Block edge parts

    Keep walk, wall, rocks, rails, bollards and planters separate.

    Gate: No detail baked into every shore segment.

  4. Check neighbor joints

    Diagram access, dock and landing ties.

    Gate: R04 connection review resolves interfaces.

  5. Package sections

    Return typology sections with no transform.

    Gate: Respect foundation reset and construction hold.

Required review views

Shore typology strip plan

Show wall/quay/boulder cases separately.

Promenade section

Show walking surface and edge with datum null.

Rocky-edge section

Keep boulders separate from promenade.

Dock/landing interface

Show optional joins and datum questions.

Shared kits & asset dependencies
Decision queue & Friday return

Which segments use recessed wall, plain promenade or rocky edge?

Owner: Legend. Resolution evidence: Accepted shore typology map on current master.

What datum governs tide, wall and boat clearance?

Owner: Legend + Quik. Resolution evidence: Approved datum and measured section.

Which rail/bollard and clear route treatment is selected?

Owner: Quik. Resolution evidence: Dimensioned section and access/interface review.

Where do docks/landings meet shoreline?

Owner: Legend + Quik. Resolution evidence: Endpoint records and neighbor review.

Friday: requires decision

  • Accepted type per segment, water datum, route width and adjacent connections.
  • Foundation reset/hold release before district assembly.

Friday: return evidence

  • Reusable components with no placement transform.
  • Typology plan/sections with datum blank or decided.
  • Proposed-only connection matrix.
Downloads & source inventory