Lost SoulsCrown Key / preparation

New exterior candidate · R01

Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

Glass Office Block

Prepare the P1 Tier C office sample with reception, office/meeting and service route; preserve the solid blue-glass stepped mass as its own variant.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Design a usable Glass Office Block with Reception and waiting lobby, Office / workspace sample, Conference room, furnishings and connected access.

Required spaces

Required exterior coverage

Required interior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA3 (proposed seat assignment) · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-BLD-0007-V02P1buildingunset

Prepare now

Open source concept image ↗Glass Office Block concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Freeze variant identityReview the silhouette before reusing any kit.
  2. 02Block stepped massSame-model axon exposes step-back and corner.
  3. 03Test frontage modulesCorner/return questions are closed or explicitly open.
  4. 04Fit office scopeNo clearance claim precedes measured plans.

Planned review views

Components & scope evidence

Scope basis: Register calls for glass frontage/corner modules. Notes describe a compact solid block with rounded/chamfered corner, blue curtain wall and stepped roof; V01 is an open courtyard ring. Single concept view is not measured.

ComponentRole and evidenceOpen questions
Stepped solid massCompact block with rounded/chamfered corner and tiered roof; no courtyard.
source_notes
  • Which corners round and how do hidden faces step?
Blue curtain wallBlue upper glazing, thin mullion language and cream slab bands.
source_notes
  • Is it continuous curtain wall or repeated framed modules?
Ground lobby/forecourtWarm glazed base and projecting forecourt-like corner; entry unclear.
source_notes
  • Is projection a forecourt, canopy or room, and where is entry?
Office/meeting kitCandidate family office/meeting module, independently fitted.
source_record
  • Which office, meeting, toilet and service spaces are selected?
Roof tiersSetback terraces, raised roof box and planted patch are visual cues.
source_notes
  • Which roof tiers are accessible and is green patch occupiable?
Modeling sequence & review views
  1. Freeze variant identity

    Keep solid mass, blue glazing, corner and setback distinct from V01.

    Gate: Review the silhouette before reusing any kit.

  2. Block stepped mass

    Separate facade, corner, lower glazing and roof tiers.

    Gate: Same-model axon exposes step-back and corner.

  3. Test frontage modules

    Show corner options without imposing a grid on unseen faces.

    Gate: Corner/return questions are closed or explicitly open.

  4. Fit office scope

    Map selected office and service plan only after measured shell/core input.

    Gate: No clearance claim precedes measured plans.

Required review views

Front/corner axon

Show blue glass, slab bands, rounded corner and roof steps.

Roof plan

Show terraces and planted patch without assuming access.

Setback section

Show facade and tier relationships, dimensions pending.

Entry/service diagram

Separate forecourt, public entry and staff/service route.

Shared kits & asset dependencies
Decision queue & Friday return

Which face is front and what is the projecting corner element?

Owner: Legend. Resolution evidence: Selected view and dimensioned ground plan.

Which corners round and how do tiers resolve on hidden sides?

Owner: Legend + Quik. Resolution evidence: Measured elevations and roof plan.

Is glass continuous or modular?

Owner: Legend + Quik. Resolution evidence: Facade detail and component schedule.

Which roof levels are accessible?

Owner: Legend + Quik. Resolution evidence: Roof plan and route/clearance review.

Friday: requires decision

  • Front, corner, forecourt role and roof access.
  • Measured envelope/core and selected playable floors.

Friday: return evidence

  • Editable V02 blockout with no V01 shell inheritance.
  • Front/corner, roof plan, section and office-kit comparison.
  • Dimension and decision register with unknowns retained.
Downloads & source inventory