New exterior candidate · R01
Open the model and drawings.
Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.
Exterior package and downloads →Draft production prep · R01 · 16 October 2026
Glass Office Block
Prepare the P1 Tier C office sample with reception, office/meeting and service route; preserve the solid blue-glass stepped mass as its own variant.
Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.
Current production program · R02
Exterior, usable spaces and a complete handoff.
Design a usable Glass Office Block with Reception and waiting lobby, Office / workspace sample, Conference room, furnishings and connected access.
Required spaces
- Reception and waiting lobby
- Office / workspace sample
- Conference room
Required exterior coverage
- Full-building hero / silhouette
- Opposite or rear side
- Entrance at player-eye level
- Defining detail / building-to-ground interface
Required interior coverage
- Lobby wide and reverse / exit view
- Selected room 1 wide and reverse
- Selected room 2 wide and reverse, when commissioned
Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.
Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.
Owner: OA3 (proposed seat assignment) · Independent reviewer: OA1-assigned independent read-only reviewer
Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs
R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.
Prepare now
- Prepare isolated mass/glass/corner/roof pieces with dimensions unset.
- Draft office/core interface and required measurement list.

Preparation / not geometry
What Quik will build and review.
Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.
- 01Stepped solid masssource notes
- 02Blue curtain wallsource notes
- 03Ground lobby/forecourtsource notes
- 04Office/meeting kitsource record
- 05Roof tierssource notes
Modeling sequence
- 01Freeze variant identityReview the silhouette before reusing any kit.
- 02Block stepped massSame-model axon exposes step-back and corner.
- 03Test frontage modulesCorner/return questions are closed or explicitly open.
- 04Fit office scopeNo clearance claim precedes measured plans.
Planned review views
Components & scope evidence
Scope basis: Register calls for glass frontage/corner modules. Notes describe a compact solid block with rounded/chamfered corner, blue curtain wall and stepped roof; V01 is an open courtyard ring. Single concept view is not measured.
| Component | Role and evidence | Open questions |
|---|---|---|
| Stepped solid mass | Compact block with rounded/chamfered corner and tiered roof; no courtyard. source_notes |
|
| Blue curtain wall | Blue upper glazing, thin mullion language and cream slab bands. source_notes |
|
| Ground lobby/forecourt | Warm glazed base and projecting forecourt-like corner; entry unclear. source_notes |
|
| Office/meeting kit | Candidate family office/meeting module, independently fitted. source_record |
|
| Roof tiers | Setback terraces, raised roof box and planted patch are visual cues. source_notes |
|
Modeling sequence & review views
Freeze variant identity
Keep solid mass, blue glazing, corner and setback distinct from V01.
Gate: Review the silhouette before reusing any kit.
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Block stepped mass
Separate facade, corner, lower glazing and roof tiers.
Gate: Same-model axon exposes step-back and corner.
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Test frontage modules
Show corner options without imposing a grid on unseen faces.
Gate: Corner/return questions are closed or explicitly open.
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Fit office scope
Map selected office and service plan only after measured shell/core input.
Gate: No clearance claim precedes measured plans.
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Required review views
Front/corner axon
Show blue glass, slab bands, rounded corner and roof steps.
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Roof plan
Show terraces and planted patch without assuming access.
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Setback section
Show facade and tier relationships, dimensions pending.
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Entry/service diagram
Separate forecourt, public entry and staff/service route.
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Shared kits & asset dependencies
Candidate kits
Proposed dependencies
- PI-BLD-0007-V01: Candidate office/meeting fit only; V02 has solid stepped mass and no courtyard. (proposed)
Decision queue & Friday return
Which face is front and what is the projecting corner element?
Owner: Legend. Resolution evidence: Selected view and dimensioned ground plan.
- production/assets/buildings/PI-BLD-0007-V02/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0007-V02/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Which corners round and how do tiers resolve on hidden sides?
Owner: Legend + Quik. Resolution evidence: Measured elevations and roof plan.
- production/assets/buildings/PI-BLD-0007-V02/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0007-V02/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Is glass continuous or modular?
Owner: Legend + Quik. Resolution evidence: Facade detail and component schedule.
- production/assets/buildings/PI-BLD-0007-V02/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0007-V02/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Which roof levels are accessible?
Owner: Legend + Quik. Resolution evidence: Roof plan and route/clearance review.
- production/assets/buildings/PI-BLD-0007-V02/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0007-V02/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Friday: requires decision
- Front, corner, forecourt role and roof access.
- Measured envelope/core and selected playable floors.
Friday: return evidence
- Editable V02 blockout with no V01 shell inheritance.
- Front/corner, roof plan, section and office-kit comparison.
- Dimension and decision register with unknowns retained.
Downloads & source inventory
README and JSON retain repository-relative source paths. Use the linked inventory here when reviewing downloaded copies.
Source inventory
- docs/current-decisions.md
- production/assets/buildings/PI-BLD-0007-V02/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0007-V02/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0007-V02/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0007-V02/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.json
- production/districts/D02-CrownKey/planning/prep/R01/ASSET_INPUTS_B.json
- production/districts/D02-CrownKey/planning/prep/R01/KIT_CATALOG.json
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/building/R05/README.md
- production/protocols/current.json
- production/protocols/district/R05/README.md
- production/workflows/spatial-imagery/R01/GUIDE.md
