New exterior candidate · R01

Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

Bridge Span

Prepare a non-placeable bridge-span study with deck, support and rail pieces; leave span, grade and endpoint transforms unresolved.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Complete Bridge Span with usable access, materials, clearances and coordinated building / waterfront interfaces.

Required spaces

Required exterior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA1 / assign after first packages · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-STR-0001-V01P1structureunset

Prepare now

Open source concept image ↗Bridge Span concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Freeze foundation inputsNo placement/map geometry begins.
  2. 02Block deck sectionVisual review separate from measured spec.
  3. 03Draw clearance testNo compliance claim before datum/route chosen.
  4. 04Separate support/ramp jointsReview section against accepted connection spec.
  5. 05Package isolated studyWorld merge and engine acceptance remain later gates.

Planned review views

Components & scope evidence

Scope basis: Foundation reset retains creator's 20 m boat-clearance and switchback-ramp requirements, but datum/implementation need a connection spec. Bridge counts/landings conflict across views; 470/940 m figures are not accepted.

ComponentRole and evidenceOpen questions
Road deck/girderLane-marked deck, pale edge and blue underside stripe; no span/lane dimensions accepted.
source_notes
  • What are deck width, grade/curvature and endpoints?
Flared pier/footingArched pier heads and dark footing cues; counts are not dimensions.
source_notes
  • What pier spacing, footing and channel section are required?
Rails/lightingGlass-metal rails, lamps and warm underside line.
source_notes
  • Which details are lighting, finish or collision?
20 m clearance profileCreator direction retained; datum/route unresolved.
source_record
  • From which datum and along which boat route is 20 m measured?
Switchback interfaceCreator requirement retained; attachment is not shown.
source_record
  • Where do ramps attach: span, landing or separate asset?
Modeling sequence & review views
  1. Freeze foundation inputs

    Record hold and image conflicts; exclude old 470/940 m candidates.

    Gate: No placement/map geometry begins.

  2. Block deck section

    Make deck/edge/rail parameterized, no guessed values.

    Gate: Visual review separate from measured spec.

  3. Draw clearance test

    Show 20 m as datum-linked placeholder, datum null.

    Gate: No compliance claim before datum/route chosen.

  4. Separate support/ramp joints

    Keep piers and switchback attachment editable.

    Gate: Review section against accepted connection spec.

  5. Package isolated study

    Return no-transform parts/views.

    Gate: World merge and engine acceptance remain later gates.

Required review views

Deck section

Show deck, underside, edge and rails; dimensions pending.

Channel elevation

Annotate 20 m direction with datum unresolved.

Endpoint plan

Show connector interfaces, no coordinates/count.

Ramp/landing axon

Show separate ramp/landing parts, no chosen attachment.

Shared kits & asset dependencies
Decision queue & Friday return

What bridge count/landings are accepted?

Owner: Legend. Resolution evidence: Decision plus map-aligned endpoint list.

How is 20 m clearance measured?

Owner: Legend + Quik. Resolution evidence: Approved datum/boat envelope and measured channel section.

Where do switchbacks attach and what path is required?

Owner: Legend + Quik. Resolution evidence: Connection spec with grades and landing IDs.

What deck profile/pier dimensions are selected?

Owner: Quik. Resolution evidence: Dimensioned plan and typical section from approved input.

Friday: requires decision

  • Accepted bridge/landing set, datum, switchback path and deck profile.
  • Foundation hold release before world placement/construction.

Friday: return evidence

  • Editable non-placeable study.
  • Deck/section/plan/ramp views with unknowns marked.
  • Source/status record excluding 470/940 m candidates.
Downloads & source inventory