Lost SoulsCrown Key / preparation

New exterior candidate · R01

Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

West Arrival Canopy

Prepare an exterior-only arrival shelter; no full interior. Treat glazed element as unresolved screen or optional booth.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Give West Arrival Canopy a complete arrival, use and service program suited to open architecture.

Required spaces

Required exterior coverage

Required interior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA2 (proposed seat assignment) · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-BLD-0012-V01P1buildingunset

Prepare now

Open source concept image ↗West Arrival Canopy concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Keep Tier ANo room model absent scope change.
  2. 02Block shell/supportsSilhouette/support count review.
  3. 03Lay out pathsRoutes wait for approved connection input.
  4. 04Check clearance fieldsNo clearance pass before measurement.
  5. 05Return connector studyNo placement or engine-ready claim.

Planned review views

Components & scope evidence

Scope basis: Register asks for covered clearance, supports and road/pedestrian/bridge interface. Notes show a low long wedge/sail with ribbed underside, flared piers and apron; endpoints and function are not shown.

ComponentRole and evidenceOpen questions
Low wedge canopyLong low sail with descending edge and thicker perimeter.
source_notes
  • What is covered headroom and which direction does it face?
Radial ribsFine underside ribbing.
source_notes
  • What rib pattern/material/structure is intended?
Flared piersTwo visible supports but total count unknown.
source_notes
  • How many supports and how do paths clear them?
Glazed screen/boothWarm mullioned element may be booth or threshold.
source_notes
  • Is it closed booth, screen or walk-through?
Apron interfacePaved area with no road/footpath/bridge shown.
source_record
  • Which approach modes and endpoints are approved?
Modeling sequence & review views
  1. Keep Tier A

    Record no full interior and booth as optional.

    Gate: No room model absent scope change.

  2. Block shell/supports

    Separate sail, ribs, piers, screen and apron with dimensions null.

    Gate: Silhouette/support count review.

  3. Lay out paths

    Separate vehicle/pedestrian approach; bridge shown only as interface placeholder.

    Gate: Routes wait for approved connection input.

  4. Check clearance fields

    Leave vehicle/character/headroom values blank until named.

    Gate: No clearance pass before measurement.

  5. Return connector study

    Plan, section and no-transform interface record.

    Gate: No placement or engine-ready claim.

Required review views

Side sail elevation

Show low wedge and ribbed underside.

Apron/support plan

Show pier candidates, screen and path options.

Canopy section

Show shell/support with clearances unset.

Arrival connector

Show endpoint placeholders, transform unknown.

Shared kits & asset dependencies
Decision queue & Friday return

Is glazing booth, screen or walk-through?

Owner: Legend. Resolution evidence: Tier A scope and access decision.

What support layout and covered clearance?

Owner: Quik. Resolution evidence: Measured control drawing after envelope supplied.

How do road/footpath/bridge meet canopy?

Owner: Legend + Quik. Resolution evidence: Accepted connection spec and route sheet.

Is apron separate and what grade applies?

Owner: Quik. Resolution evidence: Section on approved approach datum.

Friday: requires decision

  • Screen/booth role, support count, approach routes and bridge endpoints.
  • Accepted frame and clearances before fixed geometry.

Friday: return evidence

  • Editable exterior-only study and component list.
  • Plan, side elevation, section and connector diagram.
  • Missing site/clearance inputs; no interior claim.