Lost SoulsCrown Key / preparation

Draft production prep · R01 · 16 October 2026

Crown Landmark

Coordinate a bounded review of the issued exterior/interior packs and C01 candidate, preserving all source artwork and room layout while preparing explicit shell-fit decisions.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Support Quik’s Crown Landmark start with existing exterior/interior work, resolved selected-room fit, and atlas scene staging.

Required spaces

Required exterior coverage

Required interior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: EXT R06 and INT R02 retained. C02 and all81 room-fit measurements merged in PR45. C02:75 fit,5 below proposed1.2m allowance,1 outside wall/deck; all32 upper rooms fit. Shell choice, lower conflicts and actual engine evidence remain open.

Owner: Quik + CLAUDE2; OA1 atlas / review coordination · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

Latest Blender delivery · C03_r9

Crown Landmark · C03 Round 9

Quik’s latest five-module Crown Landmark exterior, with corrected mesh counts, QA reports, frozen Round 4 sources and its formal room-fit results.

Proposed exterior candidate · C03_r9 QA reported; room fit pending · Unreal not tested.

C03 r9 elevated
C03 r9 elevated · modeled candidate preview
C03 r9 front
C03 r9 front · modeled candidate preview

All renders and complete handoff →

PI-BLD-0001-V01P0buildingexisting_contract_requires_review

Prepare now

Open source concept image ↗Crown Landmark concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Reference / candidate

Compare the intent and the model.

Separate evidence types, shown together. Perspective images are not calibrated measurements.

EXT R06 · controlling front reference
EXT R06 · controlling front referenceIssued visual reference · existing source artwork
C01 · current model front
C01 · current model frontActual geometry · visual match not accepted

Actual geometry / C01

One model. Every side.

These are saved renders of the supplied editable mesh. Exterior character and room fit remain in review.

C01 · Elevated
C01 · ElevatedActual model render · review candidate
C01 · Front
C01 · FrontActual model render · review candidate
C01 · Rear
C01 · RearActual model render · review candidate

Coordination R01 / L25 + L26

Keep the room plans in view.

These existing coordination diagrams predate C01. They do not show measured C01 skin sections; use the separate C01 fit findings for its three L26 allowance conflicts.

L25 · council coordination plan
L25 · council coordination planExisting R01 diagram · not a C01 containment overlay
L26 · diplomacy coordination plan
L26 · diplomacy coordination planExisting R01 diagram · C01 allowance decisions remain open

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Freeze source baselineReview must identify the exact unchanged candidate and source inputs before interpreting fit.
  2. 02Compare C01 with R06 authorityReport target checks separately from visual-design acceptance; 02_Rear remains the rear authority.
  3. 03Reconcile INT R02 fit findingsLegend selects any revision direction; a limited rectangle audit is not furnished, rib, access, or engine acceptance.
  4. 04Prepare a scoped revision decisionNo changes to C01, room layout, design approvals, or construction hold without explicit review.
  5. 05Return review evidenceSeparate creator visual review, shell acceptance, placement and engine acceptance.

Planned review views

Components & scope evidence

Scope basis: P0; proposed Tier E. EXT R06 and INT R02 are issued; the register marks the shell pending and the L18/L19 host assignment proposed. C01 is an editable review candidate with an independent fit audit, not a design, shell, placement, or engine approval.

ComponentRole and evidenceOpen questions
R06 exterior target envelopeThe C01 audit reports its candidate matches R06 authored 240 m height and 160 × 120 m foundation targets; the targets remain proposal basis, not accepted placement scale.
source_record
  • Does Legend accept the C01 interpretation beyond the authored R06 targets, especially the unprovided upper-envelope transitions?
Six principal ribs and podiumR06 identifies the master/front and 02_Rear as controlling visual authorities; C01 contains editable interpretations of these features.
source_record
  • Which qualitative deviations in C01 ribs, podium fascia, crown, and rear treatment need a revised candidate before any shell review?
L25 council and L26 diplomacy planning zonesThe existing INT R02 layout and schedules are preserved; the independent C01 audit flags three L26 source rectangles against its stated proposed perimeter allowance.
source_record
  • Resolve the private office, secured records, and private vestibule fit finding jointly with envelope/recess/structure review; do not silently shrink or move the source rooms.
Arrival, core, atrium and circulationINT R02 describes lobby, atrium/gallery, lifts, stairs, service access, and separate diplomacy access as a design proposal; C01 is not a complete entrance/core assembly.
source_record
  • What selected rooms/routes must be included in the first shell-fit review, and which remain deferred?
Modeling sequence & review views
  1. Freeze source baseline

    Record hashes/revisions for R06, INT R02, the C01 GLB/OBJ and its fit report; leave C01, source rooms, approvals and hold status unchanged.

    Gate: Review must identify the exact unchanged candidate and source inputs before interpreting fit.

  2. Compare C01 with R06 authority

    Use named front, rear and overhead views from the same C01 mesh. Treat artwork comparison as qualitative because camera calibration is not established; use R06 authored targets only for the dimensions explicitly supplied there.

    Gate: Report target checks separately from visual-design acceptance; 02_Rear remains the rear authority.

  3. Reconcile INT R02 fit findings

    Review the reported L25/L26 planning-zone containment and exact L26 flags against the unchanged INT R02 source, then list envelope/recess/structure and layout options without editing either source.

    Gate: Legend selects any revision direction; a limited rectangle audit is not furnished, rib, access, or engine acceptance.

  4. Prepare a scoped revision decision

    If requested, write a change-impact list for envelope, room zones, access, sightlines, and reusable components; do not implement changes under this prep record.

    Gate: No changes to C01, room layout, design approvals, or construction hold without explicit review.

  5. Return review evidence

    Return source hashes, named-view comparisons, audit limitations, unresolved decisions and the exact candidate revision. Keep placement, UE import, collision, and runtime claims open.

    Gate: Separate creator visual review, shell acceptance, placement and engine acceptance.

Required review views

C01 front against R06 master/front

Review broad silhouette and entrance qualitatively from the same candidate mesh; do not claim pixel-calibrated dimensional agreement.

C01 rear against R06 02_Rear

Check the controlling crossed-gold rear treatment and record differences without substituting the secondary B02 comparison.

True overhead footprint

Compare C01 top view to the R06 roof-footprint schematic; distinguish the authored target from unapproved shell acceptance.

L25 and L26 source-zone fit review

Inspect existing overlays and the exact audit flags, keeping the interior source rectangles unchanged pending a decision.

C01 elevated/side views

Review candidate crown, rib, podium and envelope interpretations before deciding whether a new candidate revision is needed.

Shared kits & asset dependencies

Candidate kits

Proposed dependencies

    Decision queue & Friday return

    Should C01 remain a review candidate as modeled, or should an explicitly scoped new exterior candidate address named qualitative mismatches?

    Owner: Legend. Resolution evidence: Recorded creator review against R06 master/front/02_Rear and documented change-impact list; C01 itself is not approval.

    How should the three flagged L26 planning rectangles be reconciled with the candidate shell/recess/structure while preserving the INT R02 layout until a decision?

    Owner: Legend with layout author; Quik supplies candidate measurements. Resolution evidence: Joint review of unchanged INT R02 layout, C01 section evidence, and an approved revision instruction if any.

    Which selected-room routes and rooms are required in the first shell-fit sample, including independent L26 access?

    Owner: Legend. Resolution evidence: A scoped enterability decision linked to the existing room/access plan and a reviewed route/clearance plan.

    What exact project branch/map and UE checks will establish later engine evidence for this candidate?

    Owner: Quik. Resolution evidence: Current-project report naming branch/commit, engine version, map, measured import state, and separately scoped runtime tests.

    Friday: requires decision

    • Legend direction on C01 visual deviations and any new candidate revision.
    • A jointly reviewed response to the L26 perimeter findings; no room-layout or C01 edits under this prep record.
    • Quik project/branch/map evidence and any engine execution plan; this prep does not lift the construction hold.

    Friday: return evidence

    • Exact model/source hashes and rerun fit-audit output if independently reproduced.
    • Annotated R06/C01 comparisons and L25/L26 fit issue list that preserves the audit limitations.
    • Any approved follow-up instruction as a separate revision/task; no shell, placement, or engine-ready claim.
    Downloads & source inventory

    README and JSON retain repository-relative source paths. Use the linked inventory here when reviewing downloaded copies.

    Review the existing Crown exterior C01 model and fit conflicts → Readiness report: all 81 rooms measured → Exterior candidate C02 →

    Source inventory