LostSouls.world

Quik + his AI · 2026-10-17 · R01

Get caught up.
Then build together.

The recent work, the sources that control it, and exactly what to check before the next Crown Key buildings.

01

Read the current plan

Use the five-seat assignments and expanded interior scope, with current protocols.

Open →
02

Inspect Crown Landmark

Open preserved sources, merged C01/C02 and all-81-room fit evidence.

Open →
03

Return your evidence

Record actual scale, imports, collision, traversal and unresolved design decisions.

Open →

R01 · Checked 2026-10-17 · Main baseline ffac7a905ea7fe33af87b50a1d5ec73d239ed238

Current evidence and import feedback support for Quik’s Crown Landmark start. The five-seat plan and expanded building interiors are defined in R02; this R01 catch-up remains technical support, not a separate production direction. Southwest entries were refreshed for R07 against main 026bef4cf68b118a88d69f3a44c21420ff163223 on 17 October 2026. The main baseline printed below remains the original catch-up baseline; other Crown entries retain their dated source pins. Read the current Crown communications and decisions for later production priorities.

Before each session, compare main HEAD, current protocol pointer and open pull requests. If they changed, read the diff and update this packet. Never assume a merged PR is deployed or a published concept is accepted.

Take this into your AI

AI start here · Complete source/status JSON · Report template · Report JSON

The plan we are executing now

Current five-seat plan · R02 · R02 AI start here

The current five-seat production plan is at https://thelostsouls.world/CrownKey/production/plan/ and docs/crown-key-production/R02/AI_START_HERE.md. Three OpenAI seats and two Claude seats work in parallel: Quik starts Crown Landmark authoring/staging while the team completes Split Complex and Terrace Tower packages. Every enclosed building receives a lobby plus one or two useful interior spaces, with Atlas scene requirements taking priority. Open structures receive appropriate arrival and access spaces. R01 remains technical and historical support.

R02 records the creator’s expanded scope and five-seat direction. PRs #45 and #51 are merged on the checked main baseline. Earlier pilot reviews remain dated evidence, not current blockers. Actual new Unreal results have not been supplied.

Before you act

What changed

Quik delivered C03_r9 and the formal Round 4 fit

Latest pinned candidate; C03_r9 fit and Unreal pending. Quik commit b37e7fe adds C03_r9 (104 objects, 141205 faces / 284121 triangles), QA reports with 76 pass / 0 fail / 4 warn, and preserved r4 scripts. The r4 fit reports 20 of 32 upper rooms outside glass and 10 of 49 podium rooms outside interpreted wall lines. Old triangle counts were face counts: r4 is 146170 faces / 294665 triangles. Do not transfer r4 fit results to r9; the r9 fit rerun is pending. No shell/room changes or engine acceptance is granted. Actual C03 scenes remain uncommitted.

Latest Crown Key Blender builds and downloads · Crown Key five-seat production plan · R02

Current Crown Landmark and Terrace Blender deliveries

Pinned publication candidates; engine checks pending. Quik C03_r4 renders, frozen rebuild scripts and C02 evidence are pinned at 37e4b10; CLAUDE1 Terrace T01 scenes, four GLBs, 21 previews, materials/props and twelve open defects are pinned at fe5ccc9. Open the latest builds hub and matching building pages. C03_r4.blend is not committed in the Quik delivery; request the exact scene and a GLB. No asset acceptance or engine pass is implied. Push means both main and verified live .world publication.

Latest Crown Key Blender builds and downloads · Crown Key five-seat production plan · R02

Claude’s new fixture and tooling delivery is published

PR #51 merged · Quik’s Unreal results pending. Claude contract-pilot PR #51 is merged into main (merge 7a81eb8, head 3701c09), including reviewed R02 mapping, deterministic drawings/blockouts/cameras and the TEST-ONLY Quik import package. Manifest SHA-256 a232289bb781ada7fed5718b8b660a2834e4cc471ac2d8dc6ddeecbdfe578aac. Quik’s actual Unreal results remain pending. Both test contracts remain refused by the production issue gate; automatic production packaging integration is still a separate task.

Claude contract-pilot PR #51 (merged) · R01 pilot · dated evidence and reconciled status · R01 Claude handoff · historical checkpoint

Five seats now work from the R02 production plan

current creator direction. The current five-seat production plan is at https://thelostsouls.world/CrownKey/production/plan/ and docs/crown-key-production/R02/AI_START_HERE.md. Three OpenAI seats and two Claude seats work in parallel: Quik starts Crown Landmark authoring/staging while the team completes Split Complex and Terrace Tower packages. Every enclosed building receives a lobby plus one or two useful interior spaces, with Atlas scene requirements taking priority. Open structures receive appropriate arrival and access spaces. R01 remains technical and historical support.

Crown Key five-seat production plan · R02 · R01 pilot · dated evidence and reconciled status · Claude contract-pilot PR #51 (merged)

World and production rules are consolidated

current workflow. Building R05, District R05 and Spatial Imagery R01 govern preparation. The foundation reset and scale reconciliation remain open.

Shared-world brief · Current protocol pointer · Building R05 · District R05 · Spatial Imagery R01 · Scale register

Crown Landmark is ready to inspect

published review candidate. The original coordination handoff indexes 148 records and preserves EXT R06 / INT R02 and C01. Its old 32-room audit is a dated baseline; merged PR #45 adds all-81-room fit evidence and C02. Read both candidate status and the unresolved decisions before implementation.

Crown Landmark complete handoff · Exterior C01 model review · Friday first-session brief

C02 and all-81-room fit work are merged

merged PR #45 · no engine acceptance. PR #45 is merged into main at a7220dbd752382b0ca5f4f929335405d6588e505 (2026-10-17 02:17:42 UTC). C01 is preserved; C02 and all-81-room fit measurements are available. C02 records 75 fits, five rooms inside but below the proposed 1.2 m allowance, and one outside wall and deck. All 32 L25/L26 rooms fit in C02. Lower atrium/gallery clearance, L03-RM001/Rib_R1, taper and allowance decisions remain open. Publication is not shell or engine acceptance.

PR #45 · merged C02 and all-room fit · Open pull requests

All Crown Key preparation is browsable

published preparation. 31 asset prep records, 21 candidate kits, 35 proposed prop tasks and 217 work tasks are indexed. Individual asset/production records now have direct shareable pages. These counts describe preparation, not completed assets.

Crown Key production workbench · Crown Key build register · Candidate kits and props · Split Complex preparation · Terrace Tower preparation

A new Crown Landmark entry panel is on the workbench

PR #48 merged. The Crown Landmark start panel routes to issued sources and candidate reviews. Legend now reports Quik is about to begin Crown Landmark authoring/staging. Use merged C02 and all-room evidence; final shell/world placement and engine acceptance remain independent.

Crown Key production workbench · Crown Landmark complete handoff

Team responsibilities and the next-building sequence are explicit

PR #46 merged. The current five-seat production plan is at https://thelostsouls.world/CrownKey/production/plan/ and docs/crown-key-production/R02/AI_START_HERE.md. Three OpenAI seats and two Claude seats work in parallel: Quik starts Crown Landmark authoring/staging while the team completes Split Complex and Terrace Tower packages. Every enclosed building receives a lobby plus one or two useful interior spaces, with Atlas scene requirements taking priority. Open structures receive appropriate arrival and access spaces. R01 remains technical and historical support.

Crown Key five-seat production plan · R02 · R01 team plan · technical support · Claude contract-pilot PR #51 (merged)

Chris has MillerTime and a more visual Sophia lab

PRs #46 and #47 merged. Chris’s character research desk now surfaces Sophia reference artwork and source files. The browser v6, Mixamo and Quik Tripo/Unreal tracks remain distinct; no new character acceptance is claimed.

MillerTime · Chris Miller · Sophia character lab

Southwest R07 supplies a whole regional foundation candidate

proposed package for isolated review and import; engine results pending. R07 adds one manually authored metre layout for West/SW land, water, roads, bridge approaches, the E1 islet, southern nature context and retained programme reservations. Read its contract and design differences, use the JSON/meshes only in an isolated test collection, and return actual importer settings and measured evidence. R05 source maps and R06 source/import specimen remain preserved. Option A is selected with A-refined as the preferred local refinement; this does not register a final world frame, accept new dimensions or resume D03 construction. Current Crown production priorities remain separate.

Southwest R07 regional foundation · Southwest R07 AI start here · Southwest R07 source and audit · Southwest / Crown Key connections · Scale register · District IDs

Tools and other PRs need a separate status check

unverified workstation readiness. Studio Systems describes available workflows, not running agents. Launcher PRs #3/#4, cleanup PR #43 and Wire docs PR #42 remain open at this baseline. Do not depend on unmerged changes or treat the encrypted Wire as the latest catch-up feed.

Studio Systems · Launcher brief · Open pull requests

What Quik should check

Return one report using REPORT_TEMPLATE.md or REPORT_TEMPLATE.json. A blank result never means pass.

Q01 · Confirm your baseline

now · inspect/report. Record exact repo/branch/commit, Unreal version, project path and map path. Compare main and pending PRs; identify which protocols and handoff revisions you actually opened.

Return: Main SHA; local branch/SHA; engine version; project/map paths; protocol revisions; inaccessible or stale sources.

Shared-world brief · Current protocol pointer · Repository instructions · Open pull requests

Q02 · Describe the world that actually exists

now · inspect/report. Name the authoritative map if one is selected. List regions/assets as present, streamed out, removed or uncertain. Describe World Partition/data-layer state and distinguish archived District 03 geography from proposed replacements.

Return: Named overview screenshots with map/branch/revision and visibility context. Mark unverified selection or streaming assumptions explicitly.

Shared-world brief · The Grove foundation reset · Story Atlas

Q03 · Measure scale and connections

now · measure/report. Report original import units, actor/component transforms, bounds, axes/origin, water datum and bridge endpoint coordinates in a stated frame. Compare Crown Key source versions without silently rescaling/flipping geometry. Flag unresolved seam, clearance and ramp choices. For the SW R07 candidate, keep the authored metre frame separate from raw image coordinates and the authoritative world. Use its supplied Quik return template to report measured bridge/road/pedestrian joins, water clearance, collision/navigation and the actual scene/JSON hashes. Unrun checks stay not_tested; keep the current Crown queue intact.

Return: Actual measurements with units and method, transform screenshots, named endpoint records and unknowns. Do not treat source candidates as accepted engine values.

Scale register · Southwest R07 regional foundation · Southwest R07 AI start here · Southwest / Crown Key connections · District IDs

Q04 · Review the published Crown Landmark package

now · authoring/staging and measured review. Open the preserved Crown Landmark source handoff plus merged C01/C02 and all-room fit evidence. Record the candidate and source revisions used for authoring/staging, the remaining design choices and actual import/traversal results.

Return: File/revision and hash where available, importer/tool version, units/axes/transforms, comparison views, opening/traversal observations, collision status and disclosed fit issues. Untested checks stay not tested.

Crown Landmark complete handoff · Exterior C01 model review · Friday first-session brief

Q05 · Review merged C02 and all-room evidence

now · review and record decisions. PR #45 is merged into main at a7220dbd752382b0ca5f4f929335405d6588e505 (2026-10-17 02:17:42 UTC). C01 is preserved; C02 and all-81-room fit measurements are available. C02 records 75 fits, five rooms inside but below the proposed 1.2 m allowance, and one outside wall and deck. All 32 L25/L26 rooms fit in C02. Lower atrium/gallery clearance, L03-RM001/Rib_R1, taper and allowance decisions remain open. Publication is not shell or engine acceptance. Record which proposed candidate and room changes the work uses; do not mark open alternatives accepted.

Return: PR state and exact SHA; C01 versus C02 findings; missing floors/rooms and unresolved issues; no acceptance inferred from improved counts.

PR #45 · merged C02 and all-room fit · Open pull requests

Q06 · Run the isolated fixture alongside Crown Landmark work

now · isolated import/traversal test. Use the merged TEST-ONLY package: orientation fixture first, then mapped R02 sample. Return measured importer/player/camera constraints while design teams advance Split Complex and Terrace Tower in parallel. Use failures to correct affected geometry before engine acceptance, without waiting to begin independent concept and modeling work.

Return: Owner, branch, exact paths, inputs, outputs, required decisions and acceptance checks. Identify missing units/dimensions instead of inventing them.

R01 team plan · technical support · Claude assignment · Split Complex preparation · Terrace Tower preparation

Q07 · Check the tools and character lanes

now · inspect/report. Report which local tools actually run and which integrations are only described. Review Chris’s Sophia sources and distinguish browser/Mixamo/Unreal assets; note what Chris or Claude needs from Quik.

Return: Tool/version and observed result, asset/revision per track, dependency gaps and next request. No claimed workstation/character readiness without a real test.

Studio Systems · Launcher brief · MillerTime · Chris Miller · Sophia character lab

Q08 · Pick up the reviewed tooling fixture

now · TEST-ONLY import package R01 (merged in PR #51). Open START_HERE.md in the TEST-ONLY package. Check the MANIFEST.json hash, copy FEEDBACK.md outside the sealed package and fill in only that copy. Import the orientation fixture into an isolated Unreal 5.8 test map first, then the R02 sample. Do not treat Claude’s recorded Blender evidence as an Unreal pass.

Return: Original MANIFEST.json SHA-256 and the hash you computed, actual engine/importer versions/settings, measured extents and orientation/notch/pylon evidence, collision configuration, real-opening versus marker/collision observations, R02 route traversal with your character and camera, and every failure. Keep unperformed checks not tested.

Quik TEST-ONLY import package R01 · START_HERE · Claude contract-pilot PR #51 (merged) · Independent tooling review · dated findings · Quik fixture-import checklist · PR #51 (merged) · R01 pilot · dated evidence and reconciled status

After the catch-up

Follow R02: Quik authors/stages Crown Landmark; package owners complete Split Complex and Terrace Tower concurrently; Claude supports deterministic geometry and independent checks. Run the isolated fixture and feed actual results into the packages. Keep the next building complete for Quik, with another in integration; geography/frame/world placement and engine acceptance remain separate.

Use Crown Landmark as the quality and presentation benchmark while preserving each building’s approved visual identity. Next-building concept images are not supplied or approved by this catch-up packet. Generate them from controlling references; spatial views require the shared model, saved cameras and comparison evidence under Spatial Imagery R01. Record missing source art instead of inventing continuity.

Source index

Public pages and AI-readable files use absolute URLs. GitHub sources may require repository access; report any inaccessible source and do not invent its contents.

Current production direction

01 · Start

02 · Coordinate

03 · Check the world

04 · Inspect Crown Landmark

05 · See what is prepared

06 · Character and support

07 · Repository authority

Freshness and maintenance

Before each session, compare main HEAD, current protocol pointer and open pull requests. If they changed, read the diff and update this packet. Never assume a merged PR is deployed or a published concept is accepted.

Edit docs/quik-catchup/R01/CATCH_UP.json; run python tools/build_quik_catchup.py and python tools/build_quik_catchup.py --check. Commit sources, generated downloads, both site copies and regenerated directories together. Update the baseline/date, changed-work list and PR states whenever new relevant work lands. Never replace observed engine results with assumptions.