R01 · Checked 2026-10-17 · Main baseline ffac7a905ea7fe33af87b50a1d5ec73d239ed238
Current evidence and import feedback support for Quik’s Crown Landmark start. The five-seat plan and expanded building interiors are defined in R02; this R01 catch-up remains technical support, not a separate production direction. Southwest entries were refreshed for R07 against main 026bef4cf68b118a88d69f3a44c21420ff163223 on 17 October 2026. The main baseline printed below remains the original catch-up baseline; other Crown entries retain their dated source pins. Read the current Crown communications and decisions for later production priorities.
Before each session, compare main HEAD, current protocol pointer and open pull requests. If they changed, read the diff and update this packet. Never assume a merged PR is deployed or a published concept is accepted.
Take this into your AI
AI start here · Complete source/status JSON · Report template · Report JSON
The plan we are executing now
Current five-seat plan · R02 · R02 AI start here
The current five-seat production plan is at https://thelostsouls.world/CrownKey/production/plan/ and docs/crown-key-production/R02/AI_START_HERE.md. Three OpenAI seats and two Claude seats work in parallel: Quik starts Crown Landmark authoring/staging while the team completes Split Complex and Terrace Tower packages. Every enclosed building receives a lobby plus one or two useful interior spaces, with Atlas scene requirements taking priority. Open structures receive appropriate arrival and access spaces. R01 remains technical and historical support.
- Claude — merged tools available; ongoing geometry and QA: Claude contract-pilot PR #51 is merged into main (merge 7a81eb8, head 3701c09), including reviewed R02 mapping, deterministic drawings/blockouts/cameras and the TEST-ONLY Quik import package. Manifest SHA-256 a232289bb781ada7fed5718b8b660a2834e4cc471ac2d8dc6ddeecbdfe578aac. Quik’s actual Unreal results remain pending. Both test contracts remain refused by the production issue gate; automatic production packaging integration is still a separate task. Reconcile the Split H1 structure before populating its contract.
- Codex — parallel design and integration: Coordinate the three OpenAI seats and two Claude seats from R02. Keep Atlas crosswalks, asset scope, authoritative contract ownership, website status and the next complete building package synchronized.
- Quik — Crown Landmark authoring/staging start reported by Legend: Use preserved sources and merged C02/81-room evidence, record the selected working candidate and open decisions, and return actual scale/import/collision/traversal feedback. Run fixture checks in an isolated map; world placement remains separately reviewed.
- Legend — directing and reviewing: Resolve design choices and review the concrete sample/next-building results. Existing world-construction and asset-acceptance decisions remain explicit.
R02 records the creator’s expanded scope and five-seat direction. PRs #45 and #51 are merged on the checked main baseline. Earlier pilot reviews remain dated evidence, not current blockers. Actual new Unreal results have not been supplied.
Before you act
- Current creator decisions and current protocols control. This packet routes you to them; it does not create new dimensions or acceptance.
- Legend reports Quik is about to start Crown Landmark. Authoring, proposed modeling and isolated staging can proceed within that scope while other building packages advance in parallel. Final geography, shared frame, world placement, shell acceptance and actual engine acceptance remain independent decisions; this packet does not invent their approval.
- Preserve Quik’s Unreal branch/history. The freestyled District 03 coast, terrain, roads, bridges and landscape will be replaced from approved inputs; do not merge that geography into the authoritative world.
- One connected city is the intended architecture: one selected authoritative World Partition world, common coordinates and water datum. Record the actual chosen project/map; documentation alone does not select it.
- Hundreds of simultaneous online users is a design target, not measured capacity. No accepted world scale, shell, room fit, engine readiness or character asset is implied by this hub.
- D01–D21 and issued asset IDs remain stable. Area 01 Crown Key and Area 02 Southwest are production scopes.
- Work on separate branches with exact path claims. Claude may work and push his branch without repeated approval. Legend explicitly authorizes main publication of the current Crown Key pilot/preparation phase and ordinary publication/status fixes without repeated requests; preserve the independent asset and engine acceptance gates.
What changed
Quik delivered C03_r9 and the formal Round 4 fit
Latest pinned candidate; C03_r9 fit and Unreal pending. Quik commit b37e7fe adds C03_r9 (104 objects, 141205 faces / 284121 triangles), QA reports with 76 pass / 0 fail / 4 warn, and preserved r4 scripts. The r4 fit reports 20 of 32 upper rooms outside glass and 10 of 49 podium rooms outside interpreted wall lines. Old triangle counts were face counts: r4 is 146170 faces / 294665 triangles. Do not transfer r4 fit results to r9; the r9 fit rerun is pending. No shell/room changes or engine acceptance is granted. Actual C03 scenes remain uncommitted.
Latest Crown Key Blender builds and downloads · Crown Key five-seat production plan · R02
Current Crown Landmark and Terrace Blender deliveries
Pinned publication candidates; engine checks pending. Quik C03_r4 renders, frozen rebuild scripts and C02 evidence are pinned at 37e4b10; CLAUDE1 Terrace T01 scenes, four GLBs, 21 previews, materials/props and twelve open defects are pinned at fe5ccc9. Open the latest builds hub and matching building pages. C03_r4.blend is not committed in the Quik delivery; request the exact scene and a GLB. No asset acceptance or engine pass is implied. Push means both main and verified live .world publication.
Latest Crown Key Blender builds and downloads · Crown Key five-seat production plan · R02
Claude’s new fixture and tooling delivery is published
PR #51 merged · Quik’s Unreal results pending. Claude contract-pilot PR #51 is merged into main (merge 7a81eb8, head 3701c09), including reviewed R02 mapping, deterministic drawings/blockouts/cameras and the TEST-ONLY Quik import package. Manifest SHA-256 a232289bb781ada7fed5718b8b660a2834e4cc471ac2d8dc6ddeecbdfe578aac. Quik’s actual Unreal results remain pending. Both test contracts remain refused by the production issue gate; automatic production packaging integration is still a separate task.
Claude contract-pilot PR #51 (merged) · R01 pilot · dated evidence and reconciled status · R01 Claude handoff · historical checkpoint
Five seats now work from the R02 production plan
current creator direction. The current five-seat production plan is at https://thelostsouls.world/CrownKey/production/plan/ and docs/crown-key-production/R02/AI_START_HERE.md. Three OpenAI seats and two Claude seats work in parallel: Quik starts Crown Landmark authoring/staging while the team completes Split Complex and Terrace Tower packages. Every enclosed building receives a lobby plus one or two useful interior spaces, with Atlas scene requirements taking priority. Open structures receive appropriate arrival and access spaces. R01 remains technical and historical support.
Crown Key five-seat production plan · R02 · R01 pilot · dated evidence and reconciled status · Claude contract-pilot PR #51 (merged)
World and production rules are consolidated
current workflow. Building R05, District R05 and Spatial Imagery R01 govern preparation. The foundation reset and scale reconciliation remain open.
Shared-world brief · Current protocol pointer · Building R05 · District R05 · Spatial Imagery R01 · Scale register
Crown Landmark is ready to inspect
published review candidate. The original coordination handoff indexes 148 records and preserves EXT R06 / INT R02 and C01. Its old 32-room audit is a dated baseline; merged PR #45 adds all-81-room fit evidence and C02. Read both candidate status and the unresolved decisions before implementation.
Crown Landmark complete handoff · Exterior C01 model review · Friday first-session brief
C02 and all-81-room fit work are merged
merged PR #45 · no engine acceptance. PR #45 is merged into main at a7220dbd752382b0ca5f4f929335405d6588e505 (2026-10-17 02:17:42 UTC). C01 is preserved; C02 and all-81-room fit measurements are available. C02 records 75 fits, five rooms inside but below the proposed 1.2 m allowance, and one outside wall and deck. All 32 L25/L26 rooms fit in C02. Lower atrium/gallery clearance, L03-RM001/Rib_R1, taper and allowance decisions remain open. Publication is not shell or engine acceptance.
PR #45 · merged C02 and all-room fit · Open pull requests
All Crown Key preparation is browsable
published preparation. 31 asset prep records, 21 candidate kits, 35 proposed prop tasks and 217 work tasks are indexed. Individual asset/production records now have direct shareable pages. These counts describe preparation, not completed assets.
Crown Key production workbench · Crown Key build register · Candidate kits and props · Split Complex preparation · Terrace Tower preparation
A new Crown Landmark entry panel is on the workbench
PR #48 merged. The Crown Landmark start panel routes to issued sources and candidate reviews. Legend now reports Quik is about to begin Crown Landmark authoring/staging. Use merged C02 and all-room evidence; final shell/world placement and engine acceptance remain independent.
Crown Key production workbench · Crown Landmark complete handoff
Team responsibilities and the next-building sequence are explicit
PR #46 merged. The current five-seat production plan is at https://thelostsouls.world/CrownKey/production/plan/ and docs/crown-key-production/R02/AI_START_HERE.md. Three OpenAI seats and two Claude seats work in parallel: Quik starts Crown Landmark authoring/staging while the team completes Split Complex and Terrace Tower packages. Every enclosed building receives a lobby plus one or two useful interior spaces, with Atlas scene requirements taking priority. Open structures receive appropriate arrival and access spaces. R01 remains technical and historical support.
Crown Key five-seat production plan · R02 · R01 team plan · technical support · Claude contract-pilot PR #51 (merged)
Chris has MillerTime and a more visual Sophia lab
PRs #46 and #47 merged. Chris’s character research desk now surfaces Sophia reference artwork and source files. The browser v6, Mixamo and Quik Tripo/Unreal tracks remain distinct; no new character acceptance is claimed.
MillerTime · Chris Miller · Sophia character lab
Southwest R07 supplies a whole regional foundation candidate
proposed package for isolated review and import; engine results pending. R07 adds one manually authored metre layout for West/SW land, water, roads, bridge approaches, the E1 islet, southern nature context and retained programme reservations. Read its contract and design differences, use the JSON/meshes only in an isolated test collection, and return actual importer settings and measured evidence. R05 source maps and R06 source/import specimen remain preserved. Option A is selected with A-refined as the preferred local refinement; this does not register a final world frame, accept new dimensions or resume D03 construction. Current Crown production priorities remain separate.
Southwest R07 regional foundation · Southwest R07 AI start here · Southwest R07 source and audit · Southwest / Crown Key connections · Scale register · District IDs
Tools and other PRs need a separate status check
unverified workstation readiness. Studio Systems describes available workflows, not running agents. Launcher PRs #3/#4, cleanup PR #43 and Wire docs PR #42 remain open at this baseline. Do not depend on unmerged changes or treat the encrypted Wire as the latest catch-up feed.
Studio Systems · Launcher brief · Open pull requests
What Quik should check
Return one report using REPORT_TEMPLATE.md or REPORT_TEMPLATE.json. A blank result never means pass.
Q01 · Confirm your baseline
now · inspect/report. Record exact repo/branch/commit, Unreal version, project path and map path. Compare main and pending PRs; identify which protocols and handoff revisions you actually opened.
Return: Main SHA; local branch/SHA; engine version; project/map paths; protocol revisions; inaccessible or stale sources.
Shared-world brief · Current protocol pointer · Repository instructions · Open pull requests
Q02 · Describe the world that actually exists
now · inspect/report. Name the authoritative map if one is selected. List regions/assets as present, streamed out, removed or uncertain. Describe World Partition/data-layer state and distinguish archived District 03 geography from proposed replacements.
Return: Named overview screenshots with map/branch/revision and visibility context. Mark unverified selection or streaming assumptions explicitly.
Shared-world brief · The Grove foundation reset · Story Atlas
Q03 · Measure scale and connections
now · measure/report. Report original import units, actor/component transforms, bounds, axes/origin, water datum and bridge endpoint coordinates in a stated frame. Compare Crown Key source versions without silently rescaling/flipping geometry. Flag unresolved seam, clearance and ramp choices. For the SW R07 candidate, keep the authored metre frame separate from raw image coordinates and the authoritative world. Use its supplied Quik return template to report measured bridge/road/pedestrian joins, water clearance, collision/navigation and the actual scene/JSON hashes. Unrun checks stay not_tested; keep the current Crown queue intact.
Return: Actual measurements with units and method, transform screenshots, named endpoint records and unknowns. Do not treat source candidates as accepted engine values.
Scale register · Southwest R07 regional foundation · Southwest R07 AI start here · Southwest / Crown Key connections · District IDs
Q04 · Review the published Crown Landmark package
now · authoring/staging and measured review. Open the preserved Crown Landmark source handoff plus merged C01/C02 and all-room fit evidence. Record the candidate and source revisions used for authoring/staging, the remaining design choices and actual import/traversal results.
Return: File/revision and hash where available, importer/tool version, units/axes/transforms, comparison views, opening/traversal observations, collision status and disclosed fit issues. Untested checks stay not tested.
Crown Landmark complete handoff · Exterior C01 model review · Friday first-session brief
Q05 · Review merged C02 and all-room evidence
now · review and record decisions. PR #45 is merged into main at a7220dbd752382b0ca5f4f929335405d6588e505 (2026-10-17 02:17:42 UTC). C01 is preserved; C02 and all-81-room fit measurements are available. C02 records 75 fits, five rooms inside but below the proposed 1.2 m allowance, and one outside wall and deck. All 32 L25/L26 rooms fit in C02. Lower atrium/gallery clearance, L03-RM001/Rib_R1, taper and allowance decisions remain open. Publication is not shell or engine acceptance. Record which proposed candidate and room changes the work uses; do not mark open alternatives accepted.
Return: PR state and exact SHA; C01 versus C02 findings; missing floors/rooms and unresolved issues; no acceptance inferred from improved counts.
PR #45 · merged C02 and all-room fit · Open pull requests
Q06 · Run the isolated fixture alongside Crown Landmark work
now · isolated import/traversal test. Use the merged TEST-ONLY package: orientation fixture first, then mapped R02 sample. Return measured importer/player/camera constraints while design teams advance Split Complex and Terrace Tower in parallel. Use failures to correct affected geometry before engine acceptance, without waiting to begin independent concept and modeling work.
Return: Owner, branch, exact paths, inputs, outputs, required decisions and acceptance checks. Identify missing units/dimensions instead of inventing them.
R01 team plan · technical support · Claude assignment · Split Complex preparation · Terrace Tower preparation
Q07 · Check the tools and character lanes
now · inspect/report. Report which local tools actually run and which integrations are only described. Review Chris’s Sophia sources and distinguish browser/Mixamo/Unreal assets; note what Chris or Claude needs from Quik.
Return: Tool/version and observed result, asset/revision per track, dependency gaps and next request. No claimed workstation/character readiness without a real test.
Studio Systems · Launcher brief · MillerTime · Chris Miller · Sophia character lab
Q08 · Pick up the reviewed tooling fixture
now · TEST-ONLY import package R01 (merged in PR #51). Open START_HERE.md in the TEST-ONLY package. Check the MANIFEST.json hash, copy FEEDBACK.md outside the sealed package and fill in only that copy. Import the orientation fixture into an isolated Unreal 5.8 test map first, then the R02 sample. Do not treat Claude’s recorded Blender evidence as an Unreal pass.
Return: Original MANIFEST.json SHA-256 and the hash you computed, actual engine/importer versions/settings, measured extents and orientation/notch/pylon evidence, collision configuration, real-opening versus marker/collision observations, R02 route traversal with your character and camera, and every failure. Keep unperformed checks not tested.
Quik TEST-ONLY import package R01 · START_HERE · Claude contract-pilot PR #51 (merged) · Independent tooling review · dated findings · Quik fixture-import checklist · PR #51 (merged) · R01 pilot · dated evidence and reconciled status
After the catch-up
Follow R02: Quik authors/stages Crown Landmark; package owners complete Split Complex and Terrace Tower concurrently; Claude supports deterministic geometry and independent checks. Run the isolated fixture and feed actual results into the packages. Keep the next building complete for Quik, with another in integration; geography/frame/world placement and engine acceptance remain separate.
Use Crown Landmark as the quality and presentation benchmark while preserving each building’s approved visual identity. Next-building concept images are not supplied or approved by this catch-up packet. Generate them from controlling references; spatial views require the shared model, saved cameras and comparison evidence under Spatial Imagery R01. Record missing source art instead of inventing continuity.
Source index
Public pages and AI-readable files use absolute URLs. GitHub sources may require repository access; report any inaccessible source and do not invent its contents.
Current production direction
- Latest Crown Key Blender builds and downloads — Pinned C03_r4, Terrace T01 and C02 evidence; individual files, checked ZIPs and open review notes.
- Crown Key five-seat production plan · R02 — Current owners, parallel queue, expanded lobby plus one or two rooms per enclosed building, Atlas coverage and readiness gates.
- R02 AI start here · source — Copyable current instructions for all five seats and their bounded subagents.
01 · Start
- R01 pilot · dated evidence and reconciled status — Retained technical evidence; R02 controls current staffing and interior scope.
- Shared-world brief — One connected city, the foundation reset, responsibilities and Quik’s first report.
- Current protocol pointer — Recheck revisions before acting; this is the version pointer.
- Building R05 — Measured shells, room fit, scoped approval and handoff requirements.
- District R05 — Shared world frame, terrain, connections, staged district checks.
- Spatial Imagery R01 — One shared model and saved cameras; concept, aligned review and accepted reference are different states.
02 · Coordinate
- R01 Claude handoff · historical checkpoint — Dated input handoff; its pending-PR instructions are superseded by merged PR #51 and the R02 plan.
- Claude contract-pilot PR #51 (merged) — Proposed schema/fixture and drawing/blockout tools. Independent review found four corrections; keep open until fixed and rechecked. Actual Unreal import untested.
- R01 team plan · technical support — Reconciled technical checkpoint record; start with R02 for current parallel assignments.
- Claude assignment — Tooling/schema/validator work and reviewable checkpoints; check exact branch/path claims.
- Studio Systems — Local/cloud workflow, tools, task handoffs; setup inventory is not live agent telemetry.
- Independent tooling review · dated findings — Historical reproduced failures at the reviewed old head. PR #51 corrected and rechecked them before merge; retain the evidence without treating the old disposition as current.
- Quik fixture-import checklist · PR #51 (merged) — Background for the fixture checks. The TEST-ONLY package’s START_HERE.md is the current instruction; record actual Unreal versions/settings and results.
- Quik TEST-ONLY import package R01 · START_HERE — Start here for the isolated Unreal 5.8 test: orientation fixture first, then the R02 sample. Copy FEEDBACK.md outside the sealed package and record the original manifest hash a232289b… with your results.
03 · Check the world
- Scale register — Crown Key source/engine scale reconciliation; final scale remains unresolved.
- Southwest / Crown Key connections — Current Southwest hub: selected Option A / proposed A-refined, source maps and retained R05/R06 evidence, plus the R07 proposed whole-region candidate.
- District IDs — Keep D01–D21 stable. Area 01 / Area 02 are work scopes, not district renumbering.
- The Grove foundation reset — Archive old freestyled geography; rebuild from approved inputs after the hold is released.
- Story Atlas — Location/story context and placement status. A story location is not an accepted built asset.
- Southwest R07 regional foundation — Proposed regional layout, saved geometry views, JSON/meshes and independent static evidence. Actual engine import and world acceptance remain separately recorded.
- Southwest R07 AI start here — Isolated import sequence, source hashes, candidate changes and the Quik return evidence required.
- Southwest R07 source and audit — Controlling authored contract, source and design differences, deterministic package and independent audit. Publication tracked in PR112.
04 · Inspect Crown Landmark
- Crown Landmark complete handoff — Start Here, work order, task board, dimension register and source downloads; 148 index records.
- Exterior C01 model review — Editable GLB/OBJ, six views and disclosed fit conflicts. Review candidate, not an accepted shell.
- Friday first-session brief — Import/comparison instructions and evidence to return; perform only the permitted inspection/test scope.
- Friday brief for AI — Historical first-session technical instructions; the later R02 direction controls current work scope.
05 · See what is prepared
- Crown Key production workbench — 31 asset prep pages; new Start building Crown Landmark navigation panel links the existing handoff.
- Crown Key build register — 31 assets / 217 preparation tasks. Read per-record status; records are not built geometry.
- Candidate kits and props — 21 candidate kits and 35 proposed prop tasks; review reusable systems before scaling production.
- Split Complex preparation — Next-family research; unset dimensions and bridge proposals still need decisions.
- Terrace Tower preparation — Develops concurrently with Split Complex under R02; proposed dimensions, core/setback and room-fit checks remain explicit.
- Developer collections — Relentless Development, Vice Villas and Tidemark Estates; reuse and proposal status.
06 · Character and support
- MillerTime · Chris Miller — Chris’s project desk and character research assignment.
- Sophia character lab — More visible Sophia references, source inventory and first experiment. Browser, Mixamo and Unreal tracks remain separate.
- Asset archive — Original art/model/music archive; respect source and dependency status.
- Launcher brief — Workstation readiness is unaccepted; launcher PRs #3 and #4 are still open at the snapshot.
- Quik’s full directory — Find the wider build desk, game and reference pages.
- Production desk — Production records, protocols and source publication inventory.
- 15 October decisions recap — Earlier context; supplement with this catch-up snapshot and current decisions.
07 · Repository authority
- Current creator decisions — Read §7 and Foundation reset first. Repository access may be required; report inaccessible evidence.
- Repository instructions — Working branches, exact path ownership and main publication approval.
- Open pull requests — Recheck current state before using branch evidence; this page is a dated snapshot.
- PR #45 · merged C02 and all-room fit — Merged at a7220dbd; preserved C01, new C02 and all-81-room measurements. Design choices and engine acceptance remain open.
Freshness and maintenance
Before each session, compare main HEAD, current protocol pointer and open pull requests. If they changed, read the diff and update this packet. Never assume a merged PR is deployed or a published concept is accepted.
Edit docs/quik-catchup/R01/CATCH_UP.json; run python tools/build_quik_catchup.py and python tools/build_quik_catchup.py --check. Commit sources, generated downloads, both site copies and regenerated directories together. Update the baseline/date, changed-work list and PR states whenever new relevant work lands. Never replace observed engine results with assumptions.
