Lost SoulsCrown Key / preparation

New exterior candidate · R01

Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

Finger Dock

Prepare an unplaced dock module and boat/access-envelope study; leave dock count, length, shore positions, datum and support type unresolved.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Complete Finger Dock with usable access, materials, clearances and coordinated building / waterfront interfaces.

Required spaces

Required exterior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA1 / assign after first packages · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-STR-0004-V01P1structureunset

Prepare now

Open source concept image ↗Finger Dock concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Separate evidenceNo dock footprint or quantity inferred.
  2. 02Block deck/mooringAppearance review precedes dimensions.
  3. 03Select supportStructure assumptions are recorded.
  4. 04Define clearance testNo pass without measurement method and route.
  5. 05Connect to shoreNo snap location/tide behavior assumed.

Planned review views

Components & scope evidence

Scope basis: Card shows timber deck, gold-collared posts and cleats; aerial dock counts/locations differ. Creator's 20 m boat-clearance direction is retained but datum/applicability need confirmation.

ComponentRole and evidenceOpen questions
Timber finger deckNarrow plank deck with pale edge and dark underside blocks.
source_notes
  • What are deck dimensions/elevation and is deck fixed or floating?
Posts/cleatsGold-collared posts, pale caps and gold cleats.
source_notes
  • What spacing and mooring use is intended?
Support systemCard suggests floating blocks; piles are not established.
source_notes
  • Is dock floating, pile-supported or another system?
Boat envelope20 m direction retained; route/datum/applicability open.
source_record
  • Does it apply and from which water/deck/tide datum?
Shore accessAerial finger counts/locations vary and are not survey evidence.
source_notes
  • Which segments/count are approved and how connect to promenade?
Modeling sequence & review views
  1. Separate evidence

    Record card detail and aerial variation; don't read pixels as dimensions/count.

    Gate: No dock footprint or quantity inferred.

  2. Block deck/mooring

    Parameterize deck, edge, posts and cleats separately.

    Gate: Appearance review precedes dimensions.

  3. Select support

    Keep floating/pile options separate until decided.

    Gate: Structure assumptions are recorded.

  4. Define clearance test

    Show 20 m as a datum-linked blank field.

    Gate: No pass without measurement method and route.

  5. Connect to shore

    Keep STR-0003/0005 joints detached.

    Gate: No snap location/tide behavior assumed.

Required review views

Dock plan

Show deck, posts/cleats and connector with dimensions unset.

Side elevation

Show deck/water relation with datum/support open.

Boat-clearance section

Label direction and datum as unresolved.

Shore joint axon

Show detached dock/gangway/promenade.

Shared kits & asset dependencies
Decision queue & Friday return

Is dock floating or pile-supported?

Owner: Quik. Resolution evidence: Selected support detail and assumptions.

What datum measures 20 m and does it apply here?

Owner: Legend + Quik. Resolution evidence: Approved datum, route and measured section.

How many docks and which segments?

Owner: Legend. Resolution evidence: Accepted placement schedule from refreshed master.

How does gangway attach accessibly?

Owner: Quik. Resolution evidence: Joint section and measured route review.

Friday: requires decision

  • Support type, datum/20 m method, dock count and shore endpoints.
  • Foundation/shoreline reset before placement.

Friday: return evidence

  • Editable unplaced dock and envelope study.
  • Plan, side section, clearance annotation and joint axon.
  • Explicitly exclude aerial counts and old bridge-layout figures.
Downloads & source inventory