Lost SoulsCrown Key / preparation

New exterior candidate · R01

Open the model and drawings.

Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.

Exterior package and downloads →

Draft production prep · R01 · 16 October 2026

Waterfront Pavilion

Prepare the P1 Tier B sheltered lounge/kiosk or small event-room candidate only after enclosure/use selection; treat water edge as separate interface.

Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.

Current production program · R02

Exterior, usable spaces and a complete handoff.

Give Waterfront Pavilion a complete arrival, use and service program suited to open architecture.

Required spaces

Required exterior coverage

Required interior coverage

Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.

Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.

Owner: OA2 (proposed seat assignment) · Independent reviewer: OA1-assigned independent read-only reviewer

Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs

R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.

PI-BLD-0011-V01P1buildingunset

Prepare now

Open source concept image ↗Waterfront Pavilion concept reference
Existing concept reference; appearance evidence, not a measured layout or accepted build reference.

Preparation / not geometry

What Quik will build and review.

Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.

Modeling sequence

  1. 01Select use/enclosureLegend selects public scope.
  2. 02Block canopy/partsSilhouette and support review.
  3. 03Diagram entryApproach awaits accepted frame/site inputs.
  4. 04Fit Tier B roomMeasured plan covers selected accessible space.
  5. 05Package edge jointNo engine safety claim.

Planned review views

Components & scope evidence

Scope basis: Notes show wide single-storey shell under sweeping canopy on stepped plinth, but no water or hidden sides. Waterfront placement, enclosure, entry and edge protection remain open.

ComponentRole and evidenceOpen questions
Swept canopyThin broad canopy above glazed arch with dark roof slot/opening candidate.
source_notes
  • Is slot skylight, oculus or open sky?
Flared supportsTrumpet-like canopy piers; hidden count is unknown.
source_notes
  • How many supports and where do unseen ones land?
Glazed public roomLarge arch wall with central doors and smaller side arch.
source_notes
  • Which sides are open/enclosed and where is entry?
Stepped plinthLow plinth, stairs and possible side ramp/rails.
source_notes
  • How does approach meet grade and what edge protection is needed?
Tier B useCandidate lounge/kiosk/event space; storage only if selected.
source_record
  • Which use and water-edge datum/edge apply?
Modeling sequence & review views
  1. Select use/enclosure

    Keep side/back enclosure and room use open; no interior before selection.

    Gate: Legend selects public scope.

  2. Block canopy/parts

    Separate roof, slot, piers, glazing and plinth; dimensions unset.

    Gate: Silhouette and support review.

  3. Diagram entry

    Show steps, ramp, door route and water edge without selecting slope/datum.

    Gate: Approach awaits accepted frame/site inputs.

  4. Fit Tier B room

    If enclosed, fit selected small room and optional service store.

    Gate: Measured plan covers selected accessible space.

  5. Package edge joint

    Show plinth section separately from shoreline tie.

    Gate: No engine safety claim.

Required review views

Front canopy axon

Show roof sweep, piers, glazed arch and plinth.

Roof plan

Show slot/opening and footprint with purpose unresolved if needed.

Entry/plinth section

Show steps/ramp option and grade fields.

Water-edge interface

Show edge/guard alternatives and datum question.

Shared kits & asset dependencies
Decision queue & Friday return

Which sides are enclosed and what Tier B use is selected?

Owner: Legend. Resolution evidence: Use/enterability decision with plan.

Is roof slot skylight, oculus or open?

Owner: Legend. Resolution evidence: Selected roof plan and section.

What approach and water-edge safety strategy applies?

Owner: Legend + Quik. Resolution evidence: Measured edge/grade section and staging route check.

Is plinth on quay, over water or on land?

Owner: Legend. Resolution evidence: Placement/datum tied to accepted shore reference.

Friday: requires decision

  • Use/enclosure, roof slot, entry/edge protection and datum.
  • Measured grade/water datum before safety or collision claim.

Friday: return evidence

  • Editable shell with opening/enclosure options.
  • Roof plan, entry section and edge diagram.
  • Tier B scope and assumptions.
Downloads & source inventory