New exterior candidate · R01
Open the model and drawings.
Proposed isolated geometry, four views from the same model, elevations, section and editable sources. Dimensions, shell acceptance, interiors and engine verification remain separate.
Exterior package and downloads →Draft production prep · R01 · 16 October 2026
Waterfront Pavilion
Prepare the P1 Tier B sheltered lounge/kiosk or small event-room candidate only after enclosure/use selection; treat water edge as separate interface.
Current R02 scope requires a complete usable asset package. Design and isolated authoring can proceed; proposed dimensions, shell selection, site placement and actual engine checks retain explicit evidence status.
Current production program · R02
Exterior, usable spaces and a complete handoff.
Give Waterfront Pavilion a complete arrival, use and service program suited to open architecture.
Required spaces
- Sheltered arrival / orientation
- Usable lounge or kiosk area
- Service/store room only where enclosure is intended
Required exterior coverage
- Full-building hero / silhouette
- Opposite or rear side
- Entrance at player-eye level
- Defining detail / building-to-ground interface
Required interior coverage
- Arrival / user-eye view
- Lounge, kiosk or information-point view
- Support-space view if enclosed
Delivery state: Scoped — complete design: not yet evidenced; reviewed build packet: not yet evidenced; engine verification: not yet evidenced.
Audited source baseline: Catalog/source preparation and starter records; no dedicated asset design pack, drawings or model identified.
Owner: OA2 (proposed seat assignment) · Independent reviewer: OA1-assigned independent read-only reviewer
Five-seat production plan and kickoff briefs → · Full current scope → · Download all31 programs
R02 supersedes conflicting shell-only or deferred-interior recommendations in the earlier preparation records below. Proposed room uses do not create new story canon; references do not establish completed geometry.
Prepare now
- Prepare isolated canopy/support/plinth parts and enclosure toggle.
- Draw step/ramp/edge options with no grade/datum.

Preparation / not geometry
What Quik will build and review.
Component labels come from this asset’s prep record. This board is a task map, not a dimensional drawing.
- 01Swept canopysource notes
- 02Flared supportssource notes
- 03Glazed public roomsource notes
- 04Stepped plinthsource notes
- 05Tier B usesource record
Modeling sequence
- 01Select use/enclosureLegend selects public scope.
- 02Block canopy/partsSilhouette and support review.
- 03Diagram entryApproach awaits accepted frame/site inputs.
- 04Fit Tier B roomMeasured plan covers selected accessible space.
- 05Package edge jointNo engine safety claim.
Planned review views
Components & scope evidence
Scope basis: Notes show wide single-storey shell under sweeping canopy on stepped plinth, but no water or hidden sides. Waterfront placement, enclosure, entry and edge protection remain open.
| Component | Role and evidence | Open questions |
|---|---|---|
| Swept canopy | Thin broad canopy above glazed arch with dark roof slot/opening candidate. source_notes |
|
| Flared supports | Trumpet-like canopy piers; hidden count is unknown. source_notes |
|
| Glazed public room | Large arch wall with central doors and smaller side arch. source_notes |
|
| Stepped plinth | Low plinth, stairs and possible side ramp/rails. source_notes |
|
| Tier B use | Candidate lounge/kiosk/event space; storage only if selected. source_record |
|
Modeling sequence & review views
Select use/enclosure
Keep side/back enclosure and room use open; no interior before selection.
Gate: Legend selects public scope.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Block canopy/parts
Separate roof, slot, piers, glazing and plinth; dimensions unset.
Gate: Silhouette and support review.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Diagram entry
Show steps, ramp, door route and water edge without selecting slope/datum.
Gate: Approach awaits accepted frame/site inputs.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Fit Tier B room
If enclosed, fit selected small room and optional service store.
Gate: Measured plan covers selected accessible space.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Package edge joint
Show plinth section separately from shoreline tie.
Gate: No engine safety claim.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Required review views
Front canopy axon
Show roof sweep, piers, glazed arch and plinth.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Roof plan
Show slot/opening and footprint with purpose unresolved if needed.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Entry/plinth section
Show steps/ramp option and grade fields.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Water-edge interface
Show edge/guard alternatives and datum question.
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Shared kits & asset dependencies
Candidate kits
Proposed dependencies
- PI-STR-0003-V01: Candidate shore joint only after edge type/water datum; concept does not prove water placement. (proposed)
Decision queue & Friday return
Which sides are enclosed and what Tier B use is selected?
Owner: Legend. Resolution evidence: Use/enterability decision with plan.
- production/assets/buildings/PI-BLD-0011-V01/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0011-V01/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Is roof slot skylight, oculus or open?
Owner: Legend. Resolution evidence: Selected roof plan and section.
- production/assets/buildings/PI-BLD-0011-V01/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0011-V01/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
What approach and water-edge safety strategy applies?
Owner: Legend + Quik. Resolution evidence: Measured edge/grade section and staging route check.
- production/assets/buildings/PI-BLD-0011-V01/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0011-V01/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Is plinth on quay, over water or on land?
Owner: Legend. Resolution evidence: Placement/datum tied to accepted shore reference.
- production/assets/buildings/PI-BLD-0011-V01/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0011-V01/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/current.json
Friday: requires decision
- Use/enclosure, roof slot, entry/edge protection and datum.
- Measured grade/water datum before safety or collision claim.
Friday: return evidence
- Editable shell with opening/enclosure options.
- Roof plan, entry section and edge diagram.
- Tier B scope and assumptions.
Downloads & source inventory
README and JSON retain repository-relative source paths. Use the linked inventory here when reviewing downloaded copies.
Source inventory
- docs/current-decisions.md
- production/assets/buildings/PI-BLD-0011-V01/ASSET_BRIEF.json
- production/assets/buildings/PI-BLD-0011-V01/BUILDING_DIMENSIONS.json
- production/assets/buildings/PI-BLD-0011-V01/REFERENCE_INDEX.csv
- production/assets/buildings/PI-BLD-0011-V01/VISUAL_NOTES.md
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.csv
- production/districts/D02-CrownKey/planning/BUILD_REGISTER.json
- production/districts/D02-CrownKey/planning/prep/R01/ASSET_INPUTS_B.json
- production/districts/D02-CrownKey/planning/prep/R01/KIT_CATALOG.json
- production/handoffs/quik/2026-10-16/crown-landmark/R01/COORDINATION/PROTOCOL_SOURCES/Building_R05_GUIDE.md
- production/protocols/building/R05/README.md
- production/protocols/current.json
- production/protocols/district/R05/README.md
- production/workflows/spatial-imagery/R01/GUIDE.md
