LostSouls.world

Immortal Legend Studios × QuikyCode

Build the place.
Keep the context.

A shared desk for the people making Lost Souls. Read the intent, find the right source, and see what needs to happen next.

18 October · selected deliveries / candidate review

Crown R11 fixes verified. New deliveries in one handoff.

Four L26 area gates pass the independent plan check; the 227-object props export is clean. Fourteen current delivery folders retain their source records and open gates. Whole-shell defects and Unreal acceptance remain open.

Crown R11 enlarged private office model previewCrown R11 L24 to L26 plan sheet

Open previews, model downloads and independent findings → · Repository evidence →

Southwest / accepted R02 planning arrangement
All nine zones receive a foundation pass before density. Review the approved aerial, same-layout phase map, readable slot/road details and proposed waves. Metric, shoreline, world alignment and engine gates remain open. Open the nine-zone development review →. Quik remains Crown-only.
Current production direction
One connected city. Reusable architectural foundations. Measured scale before final geometry. Hundreds online is the target; engine readiness and capacity remain open tests.

16 October / Legend × Quik

The work, in view.

31 asset plans · 21 candidate kits · 35 prop tasks. Source references and the C01 review model are shown separately.
Existing Crown Key arcade concept reference31 asset plansEvery building has a next step.Components, build sequences, review views and unresolved decisions.Elevated render of the actual Crown Landmark C01 meshActual C01 geometryInspect the first model.Six same-model views, editable files and the measured L26 fit findings.Existing Crown Landmark lobby interior concept reference21 proposed kits / 35 prop tasksSee the reusable pieces.Visual context, proposed parts and the interfaces Quik needs to resolve.

Preparation and review candidates; dimensions, shell approval and engine acceptance retain their existing status.

Southwest concept-map quadrant index from one shared master imageCurrent / Southwest framework

Southwest · quadrants and build preparation

Selected border A, the local refinement, quadrant maps, bridge findings, asset evidence and the shared-model aerial capture plan. D03/D04 first; D20/D21 in the broader scope.

Open →
Crown Key production workbench: a Crown Key building conceptNew / All 31 assets

Crown Key workbench

Asset-specific components, modeling steps, review views, 21 candidate kits, 35 prop tasks and Quik’s Friday start.

Open →
Crown Landmark exterior C02 candidate, front viewNew / Exterior C02

Crown Landmark C02 + readiness

All 81 rooms measured, the confirmed conflicts, unchecked floors and a second shell candidate beside the C01 baseline.

Open →
Crown Landmark exterior C01 model, front viewNew / Exterior C01

Crown Landmark exterior

Review the first editable shell candidate, compare six views and review the measured L26 fit conflicts.

Open →
Crown Landmark controlling exterior masterNew / Prepared for Quik

Quik handoffs

Crown Landmark first: the complete reference pack, floor-fit review, editable files and next build request.

Open →
Studio Systems: cloud and local lanes feed one shared handoffNew / Legend × Quik

Studio Systems

Dots, subagents, plugins and cloud/local workflows. Find the right tool, plan scenes and hand off useful results.

Open →
01 / Start here

Quik’s project brief

Purpose, context, responsibilities, first deliverable and then the technical integration plan.

Open →
Spatial imagery workflow graphicNew / Spatial imagery

One place. Consistent views.

Measured layout, shared model, saved cameras, guided finish and overlay review. Graphic, comparison example and evidence templates.

Open →
02 / Architecture

Developer collections

Relentless Development, Vice Villas and Tidemark Estates: reusable shells with a deliberate identity.

Open →
Crown Key skyline and waterfront03 / District 02

Crown Key build plan

31 asset records, proposed interior programs and 217 concrete tasks. Search by building, developer or priority.

Open →
04 / District 03

The Grove image plan

Choose the controlling aerial, preserve the connections and develop three useful starter archetypes.

Open →
05 / Measurements

Scale register

Known source dimensions, contradictions and the evidence required before final physical scale is selected.

Open →
06 / Ideas and story

The Black Vault

Creator ideas, unresolved questions and promotion status. Read the sessions or capture the next one.

Open →
07 / Current workflow

Protocol library

Building R05 and District R05: current guides, inherited baselines, editable documents and handoff ZIPs.

Open →
08 / Geography

District IDs and order

Why stable identity and geographic display order should be separate; no renumbering is approved.

Open →
09 / Decisions

Release recap

What we changed, what the creator has selected and what still needs evidence or discussion.

Open →
10 / Visual evidence

Crown Key references

The existing aerial/orbit library and spatial source material.

Open →
11 / Issued assets

Production catalog

Existing exterior/interior packs, district records and source downloads.

Open →

These production pages are accessible to anyone with their link. Search engines are asked not to index them. The repository remains the source of record; a published idea or checklist is not a completed build or a canon approval.