Lost SoulsCrown Key / District 02

Production Wire · 19 October 2026 · source review through 20 October

District 02 image gallery.

1,281 additions across 34 source-pinned production batches; 2,025 image entries including the earlier archive. Native/export and proposed status remain explicit.

19 October 2026 · source review through 20 October · 1,281 newly indexed images

34 source-pinned batches, newest first. Open a visual or technical group to browse every image. Each image links to its served asset and immutable repository source. The earlier 744 entries remain below.

Source/native candidates, attributed engine test results and scoped planning acceptance are distinct. No final world placement or playable acceptance is inferred.

Crown Key V4 progress and revision history → · Site Finish R01 images and review evidence; reservations stay provisional.

EXISTING-CONTENT ORDER · 0 images

Four first · stage the assets we already have

Crown Landmark, Split, Crescent R03c and WEST Twist Compact R03c are the existing-content staging order. Reuse compatible assemblies; list missing pieces for later support work.

An order is not worker acknowledgment or completion. Placement stays provisional; missing rooms and unproven routes stay closed. No new reception authoring or unapproved slab cuts.

Open complete categorized batch → · Production page → · Repository →

REPORTED RUNTIME CANDIDATE · 7 images

Crown + Split · real-pawn routes, with open gates

Quik/Claude reports Crown arrival, L00–L02 lifts and both stairs passing in a Win64 Development package (23/23 scenarios). Split lift, gallery and receiving return routes also pass; these seven images are editor captures, not packaged screenshots.

Split stairs reach L19 but the exit is blocked by a reduced Nanite fallback; the two-shell fix is proposed, not applied. CORE_R, human play, video, replication and final placement remain untested/unaccepted. Crown upper suites remain disconnected. Test results are source-reported, not rerun by this wire.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 2 images

Crown C03 · numbered plots, north-up review

The numbered overhead and annotated overview expose the current placement proposal, with paired western bridges to Southwest, the southeast single bridge, Crown NNW and Split behind it. The reference desk also links the compact six-sheet PDF.

Exactly two PNGs are authorized here; older proof lineage is not promoted. Road overlaps, shoreline overrun, metric scale, exact footprints, registration and engine parity remain unresolved. Publication is not placement acceptance.

Open complete categorized batch → · Production page → · Repository →

REFERENCE REVIEW · 6 images

Crown + Southwest · the six-image foundation review

D3 follows the direct road visible in WC-REF-005; D4 reserves a continuous public landing walk and crossing. Three Southwest drawings, two unchanged Crown boards and one matched-view comparison present the approved review scope.

Design directions and image publication are approved, not physical fit or construction. Unsnapped source gaps remain visible; the flat model retains its geometry/cameras and has not reconciled the new road. Scale, north, widths, grades, registration and engine acceptance remain open.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 0 images

Boxing · six concepts and a locator, review only

Quik’s coordinator reports all seven repository images opened; Quik prefers 05 Veil Keys and 06 Channel District for the Crown backdrop. The six concepts and locator remain available in the repository packet.

This packet explicitly authorizes repository review, not website image publication; no boxing images are copied here. Sites, sightlines and fit remain 2D hypotheses. A stated preference is not site or build acceptance.

Open complete categorized batch → · Production page → · Repository →

ACCEPTED PLANNING ONLY · 8 images

Southwest · nine zones, one phased planning map

The saved 58-slot, 34-road R02 arrangement is accepted for planning. Regional and central/north/south phase drawings make the nine-zone rollout readable; District Protocol R05 is now current.

Arrangement acceptance is not metric, north, terrain, world registration or runtime approval. The 12/58 starter allocation is a proposal, not completion; later global 8+4 staging guidance is separate. Quik remains Crown-only.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 0 images

Crown R02B · flush threshold, preserved recovery

The flush derivative excludes the recoverable threshold object without cutting the floor. The coordinator reproduces 960 route/body outcomes and dedicated guard/rail checks; the selected open slice is used in later sandbox reports.

No new views were rendered in this batch. Static contract checks do not establish design or engine acceptance; see the newer sandbox card for attributed runtime results. Hardware, rail/guard design and final L02 height remain open.

Open complete categorized batch → · Production page → · Repository →

PUBLISHED CANDIDATE · 9 images

Grove + South Beach · the published visual refresh

The current Grove R04 focus crop and South Beach card preserve approved WC-REF-005 source geography. Three new resort views add beach, pool and suite context; master and thumbnail derivatives are grouped separately.

Visual publication is not measured geography, native/export or Unreal acceptance. Older reconstructed/broad Grove previews remain source history, not current authority. D03 construction remains paused; POI inclusion does not reassign districts.

Open complete categorized batch → · Production page → · Repository →

REFERENCE REVIEW · 1 images

One world key · all 21 districts, clearly named

The unchanged canonical labeled world map is now discoverable in the production overview, with a 21-district key that distinguishes Sunset Bay and Genesis Campus. D02/D03/D04 alone are visually modernized.

This reuses legacy orientation artwork, not a newly measured world master. Other 18 districts remain legacy/pending; boundaries, world registration and engine acceptance are not changed.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 52 images

Crown arrival R02 · hardware, guards and rails

Door hardware, stops and seals join the entrance candidate, with two L02 guards and proposed stair rails. The coordinator reproduced all 960 route/body outcomes and the static pose sweep.

Historical R02 static Blender evidence; superseded for the selected flush slice by R02B. Later runtime results belong to the separate sandbox record, not these renders. Hardware design and final L02 height remain open.

Open complete categorized batch → · Production page → · Repository →

REFERENCE REVIEW · 7 images

Southwest · sectional cards and POI locales

Five source-crop sectional cards and a locale guide make the Southwest targets easier to find. Approved visual inputs retain their limited scope.

Section-to-POI associations remain proposals. The historical Atlas context is retained as historical, with no invented transfer of coordinates or measured world acceptance.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 21 images

Crown entrance R01 · open and closed leaves

Two bronze/glass leaves add open and closed entrance states and an out-and-back interaction contract. Record 079 reports coordinator reproduction of the 864 route/body outcomes and 91-pose sweep.

Native/export candidate, retained before R02. Runtime interaction, capsule testing, egress and engine acceptance remain not_tested.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 21 images

Crown lower stairs and gallery guards

The lower stairs and galleries were measured, and two guard panels close the exposed L02 stair-top edges in a derivative.

The issued L02 requirement stays 5.40 m; the measured finished clearance is 5.10 m. Guard design and engine tests remain open.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 31 images

Split and Terrace · measured review

Split's stored stair route was re-executed and a tread-derived route tested. Terrace's room and bath ledger was remeasured without changing geometry.

The route findings do not approve the deeper landing. The Terrace bath enlargement remains an owner decision; engine checks are not_tested.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 50 images

Six structures · split exports and checks

Six isolated structures were checked as three coupons, with split exports and matched views. The source lists unresolved datum and waterfront interface discrepancies.

The packaged coupon cannot deliver 20 m boat clearance with its current footing/water relationship; placement and engine acceptance remain open.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 61 images

Offices, residences, terrace and arcade · review

Offices, residences, Compact Terrace and Long Arcade received source-pin, split-export and matched-view reviews; source geometry was unchanged.

Residence joints and unauthored vertical access remain. Glass Office's 0.79 m planned margin uses the revised route endpoint; engine tests are not_tested.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 81 images

Arcades, pavilions and canopies · review

Arcades, pavilions and canopies were rechecked without geometry changes. The review remeasures the step-free ramp bays and lists pavilion/canopy glazing gaps.

A passing route is not accessibility compliance. Joint policy, ramp handrails and engine tests remain unresolved.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 19 images

Southwest W1 · proposed shore coupon

A proposed W1 west-bank coupon adds a quay, banks and promenade as a derivative, preserving the original candidate meshes.

Slope, toe, freeboard and quay extent are assumptions. Tide, surge, guards, world registration and engine tests remain open.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 42 images

Garden pair · split exports and checks

Both Garden variants received split-export, route and matched-view reviews without changing their source geometry.

Terraced Garden's two 8.3 mm readings are retained and explained in the source; fit, placement and engine acceptance remain open.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 16 images

Southwest bridges · candidate datum measurements

Bridge and connection measurements reproduce 20 m over the candidate water datum at the coarse coordinator check; geometry was unchanged.

There is zero freeboard margin at water z=0, and the same condition fails against ground +2 m. The shared world frame is not accepted.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 60 images

Frame and Straight pairs · split exports and checks

Frame Mid/Compact and Straight Tall/Slim received source-pin, split-export and matched-view checks without geometry repair.

Frame Mid's two 20 mm joints and Straight Tall's setback-ledge route failure remain visible. Engine checks are not_tested.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 8 images

Southwest marina-water · Blender reproduction

The amended marina-water package was reproduced in Blender with 238 meshes and metric controls; matched neutral views document the candidate.

Reported native reproduction does not establish the shared engine frame, final shore geometry or construction approval.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 48 images

Crown lobby, waiting room and lounge

A furnished lobby, RM004 waiting room with door states and lounge were derived from R11, with before/after views and hashed exports.

Visual choices remain proposals. Inherited slice boundaries and context defects remain; runtime doors and engine tests are not_tested.

Open complete categorized batch → · Production page → · Repository →

NATIVE / EXPORT CANDIDATE · 25 images

Frame Tall and Crescent · first split-export review

Frame Tall and Crescent received pinned-source, split-export and matched-view checks with no geometry changes.

Crescent's 160 leaf-clearance readings and Frame's bronze-band appearance remain review items; engine acceptance is open.

Open complete categorized batch → · Production page → · Repository →

PUBLISHED CANDIDATE · 12 images

Southwest · marina-water model and projections

The creator-directed basin correction removes the marked marina from the land solids and opens it to the sea; the package includes corrected geometry projections.

These are deterministic candidate projections and source markups. Final shoreline, shared frame, world placement and engine acceptance are not established.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 7 images

Frame, Straight and Garden glazing repairs

Derivative repairs close reported Frame, Straight and Garden glazing slots; the source preserves two Terraced Garden readings and modelling caveats.

Straight Tall's setback-ledge route still fails. Joint buildability, visual decisions and engine tests remain open.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 30 images

Arcade ramps and glazing measurements

Curved and Corner Arcade gain proposed 1:16 entry-ramp bays. A read-only joint survey and a Glass Office endpoint recheck accompany the work.

The joint survey is measurement, not repair; accessibility, drainage and engine compliance are not established.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 86 images

Crescent Hotel · deeper flank terraces

Crescent's flank terraces deepen and step back, with planting, privacy fins and framed openings; the centre retains its earlier depth.

Upper terraces remain non-enterable and room fit is untested. This is a proposed derivative, not an accepted hotel shell.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 122 images

Twist pair · clear views, open headroom gate

Twist's changed wrap pitch clears the reported pad-view gate on both variants while keeping the shallower risers.

The headroom gate still fails: minimum pad clearance is 3.323 m Tall and 3.467 m Compact. Design options await an owner decision.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 9 images

Crown R11 · area gates and prop repairs

R11 addresses the four L26 area gates and repairs the reused props export. The linked integration review records the independent plan/mesh findings.

Whole-shell defects, L25 pantry shortfall, working lifts, door leaves and engine acceptance remain separate open gates.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 41 images

Split SP-Q04 · landing repair candidate

A proposed 0.15 m deeper landing revises the stored stair-route turn. The later separate review provides the reproduced and tread-derived route evidence.

Source-reported route passes are bounded tests; whether to retain the plan change remains the owner's call.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 188 images

Stepped and Compact Residences R03

Both Residence variants receive continuous roofing, revised glass/panels and the declared tray/slot repairs, with before/after views.

No authored stairs/lifts or complete room-program fit is claimed. Joints, door states and engine testing remain open.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 202 images

Crescent and Frame Tall · lobby-to-deck links

Crescent and Frame Tall gain real lobby-to-deck stairs and doors; Frame's node proportions are refined.

Retained comparison revision: later Crescent and Frame derivatives follow. Neither deck has a modelled step-free route; engine tests are not_tested.

Open complete categorized batch → · Production page → · Repository →

PROPOSED · 9 images

Crown R10 · L24 overflow proposal

The earlier R10 proposal adds L24 overflow and a pantry annex while exposing L26 office/vestibule shortfalls.

Retained comparison revision. R11 later addresses the area and props findings; R10 is not promoted as the selected candidate.

Open complete categorized batch → · Production page → · Repository →

Previous wire release · 590 proposed images

Seven Quik/Claude candidate batches, newest source record first. Every card links to its served image and the exact repository branch path. Earlier source-linked material stays below.

PROPOSED · R03 · 236 source images

Courtyard Offices + Glass Office Block

The source report records the Glass Office stress route passing with 0.00 m side margin at its endpoint; all route and engine acceptance remains open.

Visual renders 176 images

Same-camera comparisons 44 images

Comparison sheets 2 images

Plans and geometry 14 images

PROPOSED · R03 · 114 source images

Inner + Waterfront Pavilions

The source report records roof and glazing checks; roof drainage and sibling-toolkit reuse remain unchecked.

Visual renders 50 images

Same-camera comparisons 58 images

Plans and geometry 6 images

PROPOSED · R03 · 156 source images

Compact Terrace Block + Long Arcade

The source report keeps L00-to-L01 vertical access as a core placeholder; placement and acceptance remain open.

Visual renders 60 images

Same-camera comparisons 76 images

Plans and geometry 20 images

PROPOSED · ISOLATED COUPONS · 9 source images

Six structure interface coupons

The source report gives no district placement or span approval; 20 m boat clearance remains unverified and unresolved.

Visual renders 9 images

PROPOSED · R03 · 34 source images

West + East Arrival Canopies

The source reports seam and route passes in its stated checks; Unreal, collision, egress, access and structural review are not tested.

Visual renders 32 images

Same-camera comparisons 2 images

PROPOSED · SP-Q03 · 40 source images

Split Complex SP-Q03 repair

The source report still shows the stair route failing at radii 0.55 m and 0.60 m; the repair remains open.

Sections and elevations 10 images

Technical sheets 1 images

Occupancy maps 1 images

Workbench views 28 images

PROPOSED · TR-Q04 · 1 source images

Terrace Tower TR-Q04 ledger

The source report says the bath enlargement is awaiting an owner decision.

Plans and geometry 1 images

Earlier source-linked material · 154 images