Lost SoulsCrown Key / preparation

Draft production prep · R01 · 16 October 2026

Quik · first Crown Key session

Start with the actual Crown Landmark C01 review candidate, preserve the issued sources and return evidence that resolves a small set of decisions. The other 30 assets now receive source-backed preparation, not completed shells.

Draft preparation only; not an issued reference pack, shell, approval or construction release. Foundation hold remains in force; preparation does not authorize construction or accept dimensions, placement or engine readiness.

Preparation and isolated review do not release the existing construction hold or accept any shell, placement, world scale or engine readiness.

Review the current Crown exterior C01 →Readiness report: all 81 rooms measured →Exterior candidate C02 →

Reference / candidate

Compare the intent and the model.

Separate evidence types, shown together. Perspective images are not calibrated measurements.

EXT R06 · controlling front reference
EXT R06 · controlling front referenceIssued visual reference · existing source artwork
C01 · current model front
C01 · current model frontActual geometry · visual match not accepted

Actual geometry / C01

One model. Every side.

These are saved renders of the supplied editable mesh. Exterior character and room fit remain in review.

C01 · Elevated
C01 · ElevatedActual model render · review candidate
C01 · Front
C01 · FrontActual model render · review candidate
C01 · Rear
C01 · RearActual model render · review candidate

Coordination R01 / L25 + L26

Keep the room plans in view.

These existing coordination diagrams predate C01. They do not show measured C01 skin sections; use the separate C01 fit findings for its three L26 allowance conflicts.

L25 · council coordination plan
L25 · council coordination planExisting R01 diagram · not a C01 containment overlay
L26 · diplomacy coordination plan
L26 · diplomacy coordination planExisting R01 diagram · C01 allowance decisions remain open

First session

  1. Identify the working environment

    Record the actual software/version, machine, project commit, staging scene/map and any existing local Crown Landmark model. Keep the authoritative world untouched.

    Return evidence: A short session header and a screenshot of the isolated scene/map.

  2. Import the supplied candidate

    Open the C01 GLB or keep the OBJ and MTL together. Use the appropriate importer axis/unit conversion, record the transform and verify the authored 240 m height above ground and 160 × 120 m foundation. The proposed foundation extends below ground; full mesh bounds differ from height above ground.

    Return evidence: Import settings, object hierarchy, transform, measured extents and visible ground datum.

  3. Compare the same model

    Capture front, rear, sides, top and elevated views from this exact model. Compare its ribs, podium, atrium and crown to EXT R06 master/front and 02_Rear. Reference cameras are not calibrated; appearance comparison remains qualitative.

    Return evidence: Named same-model views and a short mismatch list tied to each controlling reference.

  4. Check the upper-room interfaces

    Overlay unchanged INT R02 L25 and L26 room rectangles with actual shell sections at room bottoms and clear-height tops. Start with the three documented L26 allowance conflicts, then inspect rib, core, door, stair, lift and camera relationships separately.

    Return evidence: Section overlays, exact room IDs, measured margins and a distinction between containment, assembly allowance and usable space.

  5. Return one coherent review revision

    Save the editable source and record changes, source revisions, measurements and unresolved choices. Keep candidate review, creator visual selection, shell acceptance, placement and engine acceptance separate.

    Return evidence: Editable revision, changed-file list, same-model images and a completed decision/issue list.

Can prepare now
  • Review and organize the source-backed per-asset plans and candidate kit/prop tasks.
  • Set up a separate asset study scene, consistent naming and saved review cameras.
  • Inspect/import the supplied candidate and report what the model actually measures.
  • Prepare separate component studies once their proposed interfaces are recorded; keep them distinct from accepted production geometry.
Requires selection
  • Final Crown Landmark visual direction and upper-envelope/room-fit resolution.
  • Actual component dimensions and interfaces before claiming a production fit.
  • Enterable program, placement/orientation and any later asset priority changes.
  • Resumption of authoritative district/world construction under the Foundation reset.
Review decisions

Exterior character

Review the broad sail-like ribs, sculpted podium fascia, amber atrium/lattice and crown junctions. C01 is simplified; do not describe its silhouette as an accepted R06 match.

Owner: Legend with Quik’s model evidence

L26 private office

L26-RM003 has a 0.668 m minimum raw skin margin and a −0.532 m residual against the proposed 1.2 m assembly allowance.

Owner: Legend and Quik

L26 secured records and vestibule

L26-RM004 and L26-RM005 touch the candidate skin, with 0 m raw margin and a −1.2 m residual against the proposed allowance. Existing room coordinates remain unchanged.

Owner: Legend and Quik

Select and document a resolution

Compare envelope/recess/structure changes with a separately revised room-layout option. A different assembly allowance needs evidence for the actual assembly; changing the check alone does not resolve fit. No option is selected in this preparation.

Owner: Legend with Quik’s measured options

Return checklist & source records
  • Software/version, machine, commit and staging scene/map
  • Exact input source/model revisions and import settings
  • Editable returned model and clear part names
  • Six same-model views plus source comparisons
  • Measured sections and unchanged source-room overlay
  • Core, access and player/camera observations with test settings
  • Decision list separating proposed, selected, modeled and engine-verified results
Download Friday briefFriday brief JSON