# Visual notes · Dock Connection · PI-STR-0005-V01

Observations from concept art only: not dimensions, not approved. Sources: 04_Structures_Global_IDs.png, 31-Crown-Key-Island-with-Three-Bridges-5.png, 36-Crown-Key-V3-Master-District-Card.png, 37-Crown-Key-Aerial-with-West-Beaches-and-Yachts.png, 30-Crown-Key-aerial-with-four-yachts-6.png.

## What the concept shows
- Card 04: an inclined gangway from the stone promenade down to a timber dock deck. The gangway has a plank or grated deck and a truss-style side rail of thin metal with diagonal members on both sides.
- At the top it meets a pale stone block on the promenade, with a gate-like rail and a lamp post. There is a short rail section at the top with glass-and-metal rail.
- The lower end meets the timber deck of a dock. Dark gold-collared posts stand at the transition and under the upper block (about 3 visible; a count, not a dimension).
- The card does not show the hinge, rollers or any joint detail.
- Signature features not to lose: diagonal truss rail, timber deck, pale stone head block, gold-collared posts.

## How it appears in the district images
- 31, 37, 36: no clear gangway is visible. Docks appear joined to the promenade; the connection detail is too small to read.
- 36 "Lagoon Waterfront" inset: no gangway visible.

## Image conflicts
None found.

## Open questions for design and modeling
1. Is the connection fixed or hinged? A ramp that changes with the tide, or fixed?
2. Is this the same thing as the "switchback ramps" in the creator requirement? Probably not; they are not identified in these images. Not checked.
3. How does the slope relate to accessibility? No data.
4. Where does it attach: to the seawall (PI-STR-0003-V01), to the finger dock (PI-STR-0004-V01) or both? Does it repeat at every dock?
5. Does it use the 20 m boat clearance requirement anywhere? Unknown.

## Other images found
None found.
