# Visual notes · Bridge Span · PI-STR-0001-V01

Observations from concept art only: not dimensions, not approved. Sources: 04_Structures_Global_IDs.png, 31-Crown-Key-Island-with-Three-Bridges-5.png, 36-Crown-Key-V3-Master-District-Card.png, 37-Crown-Key-Aerial-with-West-Beaches-and-Yachts.png, 30-Crown-Key-aerial-with-four-yachts-6.png.

## What the concept shows
- Card 04 (isometric, "not to common scale"): a straight road deck with a lane-marked grey surface, a light concrete or stone-looking girder edge, and a blue stripe along the deck underside.
- Support system: piers each with a flared, arched head that spreads into the underside of the deck, and a dark blue-grey footing block at the base. About 3 visible piers on card 04; a count, not a dimension.
- Piers carry a narrow vertical glowing slot (warm light) on their face. A warm light line runs along the underside edge of the deck.
- Railings: a metal rail with glass-looking infill panels, plus taller lamp posts with a glowing top at intervals.
- Bare architecture on the card: no vegetation, no vehicles.
- Signature features not to lose: flared pier heads, blue underside stripe, warm accent lighting, lamp posts, glass-and-metal rail.

## How it appears in the district images
- 31, 37, 36 (main aerial): about 3 road bridges visible on each; a count, not a dimension. Two meet one side of the island and one meets the opposite side. These images carry no compass; the PI-007 review treats the two-bridge side as the west approach.
- In the aerials the bridges are low, multi-lane road decks with palms along the approaches, cars on the deck, and several short pier groups under them. Pier shape is too small to read.
- 30 (rear-shore aerial): bridges visible at the left edge and at the right side (about 2 on the right). Orientation of this view is unclear.
- 36 "Bridge Arrival" inset: a road deck with side rails seen from deck level, running toward the skyline.

## Image conflicts
- West-side bridge count and landing points differ between image sets; see PI-007 (web/lostsouls-world/dist/production/west-coast/crown-key-approach/index.html). Not resolved here.
- Image 30 appears to show a different bridge arrangement (about 2 on its right side) from 31/36/37. May be a different viewing direction; unconfirmed.

## Open questions for design and modeling
1. PI-007: how many road bridges, and which landings, are canon on the west side? Does this span exist once as a kit piece or in variants per bridge?
2. Is there a pedestrian bridge? No image viewed for these notes shows one.
3. The creator requirement for 20 m boat clearance and the switchback ramps: how does this span's profile (flat vs arched, underside) carry them? Not checked here.
4. Is the deck straight on every bridge, or curved? Card 04 shows straight; the aerials show gentle bends.
5. What are the pier spacing, pier count per bridge and channel width? Not readable from the images.
6. Are the blue underside stripe and pier light slots functional lighting or paint?

## Other images found
None found beyond the references above (24 to 37 in references/ were not all opened).
