Lost Souls

NATIVE / EXPORT CANDIDATE · 16 images · 18 Oct 2026 · 04:25 ET

Southwest bridges · candidate datum measurements

Bridge and connection measurements reproduce 20 m over the candidate water datum at the coarse coordinator check; geometry was unchanged.

There is zero freeboard margin at water z=0, and the same condition fails against ground +2 m. The shared world frame is not accepted.

Production page → · Exact repository package → · Source status →

Sections and cut views · 7 images
Plans and ledgers · 8 images
Model and scene views · 1 images