{
  "package_id": "SW-REGIONAL-FOUNDATION-R07",
  "status": "ALL_ACTUAL_ENGINE_AND_CREATOR_ACCEPTANCE_OPEN",
  "contract_acceptance": {
    "candidate_authoring_complete": true,
    "creator_accepted": false,
    "approved_for_construction": false,
    "accepted_world_integration": false,
    "actual_engine_import_verified": false,
    "district_3_construction_pause_preserved": true,
    "native_assets_rescaled": false
  },
  "required_checks": [
    "Closed simple CCW land/parcel rings and finite XYZ; native Crown ring exactly re-expressed atscale1.",
    "Every complete parcel lies within its land; distinct parcels do not overlap; hosted017 subspace lies within006.",
    "Every programme access reaches its exact parcel entry and the connected mainland/Crown/islet graph; southern island remains a separate boat-only pedestrian component.",
    "All physical road junctions use explicit common XYZ and matched trimmed portal chords, with no undeclared geometric intersections or broad coplanar overlaps.",
    "Full-width24m bridge approach footprints lie on declared land; entire actual water beneath every bridge hassoffit>=20 above the common water0.",
    "All three100m navigation prisms remain open; no terrain, road, pedestrian or zone physical mesh intrudes into their interiors.",
    "Historic Crown footprint/road impacts are reported quantitatively; historic comparison geometry is never silently deleted, resized or treated as accepted placement.",
    "Nineteen programmes and21 source view identities preserved; four conditional programmes retained;18/20 nonadditive; source null anchors stay null.",
    "True plan/obliques/sections and clean/labelled pairs derive from this same geometry revision and saved cameras; exact mesh checksums accompany views.",
    "Actual engine, collision, accessibility, structure, bathymetry, surface drainage, final terrain and creator acceptance remain unverified until returned evidence."
  ],
  "limits": [
    "The flat+2m land cap is a foundation study surface. Closurebase-8m closes display solids; it is not seabed, geology, coastalwall or foundation engineering.",
    "No room counts, building footprints, accepted shells, transformed source pixels or existing engine asset moves are issued.",
    "Detailed shore slopes, drainage, supports, barriers, lane allocation and native-asset reuse placements are subsequent candidate refinements.",
    "A successful static validation or portable import is not creator acceptance and does not resume paused D03 construction."
  ]
}
