# R07 design review and source differences

17 October 2026 · Marley / Codex · GPT-6 Astra, Extra High

## What was chosen

This is one authored layout hypothesis, with useful geometry for the whole Southwest preparation scope. No metric dimensions were extracted from the perspective concept image. Existing source controls remain available for comparison, and the contract identifies their functional counterparts without claiming a geometric projection.

The layout has a western mainland, a narrow northern continuity apron, Crown Key to the east, a separate southern nature island and the small islet reached by E1. Ground is a deliberately simple z=2 m foundation study surface above proposed high water z=0. The −8 m solid closure is a modeling convention, not bathymetry, coastal-wall design or geology. Shore slopes, drainage and final terrain remain later refinements.

| Land body | Authored bounding dimensions | Area | Authority |
|---|---:|---:|---|
| Southwest mainland | 2,900 × 4,100 m | 8,941,250 m² | New proposed envelope. |
| Northwest continuity apron | 2,500 × 500 m | 1,057,500 m² | New context envelope sharing the exact Southwest seam. |
| Crown Key | 1,281.4 × 1,274.2 m | 1,255,283.58 m² | Native v02 coast at scale 1; proposed translation only. |
| Southern island | 1,650 × 1,040 m | 1,183,250 m² | New whole-island nature envelope. |
| E1 islet | 250 × 320 m | 73,300 m² | New compact connection context. |

These are design dimensions, not accepted geography. The mainland size reserves space for the approach corridors and programme clusters; a smaller or differently shaped regional hypothesis remains a legitimate future revision. No existing model receives this regional envelope as a scale factor.

## Bridges and the water datum

All three proposed connections use 24 m reserved road bands, a high deck at z=22 m and a 2 m deck depth. The resulting soffit is z=20 m above the same proposed high-water plane. High plateaus cover all actual water beneath the complete road width. A separate 100 m wide clear navigation prism is explicitly located inside each channel.

| Connection | Axis Y | Actual centerline water gap | High plateau X interval | Approach treatment |
|---|---:|---:|---|---|
| W1 | +250 m | 320.958621 m | −10 to 335 m | 460 m on land at each end; total profile 1,265 m. |
| W2 | −250 m | 400.284615 m | −10 to 418 m | 460 m on land at each end; total profile 1,348 m. |
| E1 | −250 m | 675.666667 m | 1,513 to 2,240 m | 460 m Crown approach, high water crossing, then compact islet descent. |

The native Crown coast varies across each 24 m band. Checking its full width gives at least **10.414 m, 10.665 m and 10.8 m** of land inset at the W1, W2 and E1 Crown plateau ends respectively. The corresponding centerline intercept alone would not establish this.

Each straight 460 m approach contains 60 m of entry transition, 340 m at 5%, and 60 m of exit transition. Their rises are 1.5 + 17 + 1.5 = 20 m. The landings remain at z=2. The historical native bridge polylines are not long enough for this arrangement and are not reused as compliant high bridges.

The 20 m clearance is a retained creator requirement applied explicitly to all three connections in this hypothesis. Water datum, grade, structure depth, navigation width and margin remain proposed design assumptions. No tide, vessel draft, support design or structural acceptance is implied.

## Compact E1 islet

An early straight-descent draft needed a 700 × 770 m islet. The selected candidate keeps the islet much smaller and puts a slow vehicle descent on it:

- Four straight legs, each 120 m long and dropping 5 m.
- Each leg uses a 20 m transition, 80 m at 5%, and a 20 m transition.
- Three level semicircular turns have 20 m centerline radius.
- The analytic 24 m road envelope is 184 × 144 m; its inner turn radius is 8 m.
- Horizontal route length is **668.495559 m**; analytic 3D length is **668.961951 m**.
- Each half-circle is sampled with 128 segments. Analytic length and emitted chord length are recorded separately.

The 73,300 m² islet is about **5.84%** of the native Crown coast area. That comparison describes this proposed plan; it does not calibrate the source image. The tradeoff is a conspicuous folded arrival route whose vehicle swept paths, barriers and supports still need review. An 8 m inner radius is an analytic geometric value, not a vehicle-turning certification.

The lower road portal is `(2240, −130, 2)`. A 20 m westward flat stub, 30 m northward segment and 100 m eastward exit connect it to the ground. Both turns have declared 18 m junction-core radii. Their 13.416408 m cutbacks leave positive straight lengths and do not consume the sloping leg.

## Pedestrian connection

The required PED route is proposed alongside W1. Its 3 m crossing occupies a reserved band inside the 24 m bridge corridor. Two eight-run folds provide the 20 m rise with 5% flights, inline rests and level turns. Their geometry recipe is carried from R06, now placed explicitly in this regional candidate.

The west fold was moved 4 m inland after checking the full reservation against the sloping West shore. The eastern fold sits farther inland on Crown. Upper connections remain at z=22; lower connections reach designated flat-road crossing portals at z=2. A geometric XY overlap never substitutes for a shared XYZ portal.

The lower connectors end with 6 m flat segments aligned with the first sloping flights. This repairs the earlier perpendicular butt join: the final approach now provides a matching full 3 m portal instead of merely sharing one centerline point. The tight west connector corner remains 5.125 m inland. Each repaired lower connector is 12 m longer; the fold profiles are unchanged.

The west upper connector travels from `(−18, 298, 22)` to `(−8, 298, 22)`, then south to `(−8, 260.5, 22)`. Its physical slab ends at the bridge's north edge, y=262, with a full 3 m cap spanning x=−9.5 to −6.5 inside the flat plateau. This replaces a prior route that overlapped the descending approach. Part of the revised connector is elevated over the sloping coast; its z=21.8 soffit exceeds the 20 m water clearance. The remaining walking route uses the existing bridge deck. The east connector similarly arrives at x=333 with its full cap inside the plateau. Neither repaired upper join relies on intersecting slab volumes.

The builder can reuse the supporting road surface where a walking band occupies it, trimming duplicate physical slabs while retaining the complete route centerline. This prevents broad coplanar duplicate faces. Walking, collision, traffic separation and accessibility remain untested.

## Road and programme choices

The ten R05 road identities are retained as functional references. Their candidate positions and connecting streets are newly authored. RD06 now joins the regional network at both ends. The three ambiguous RD04/RD08/RD09 image crossings become **one explicit six-arm at-grade Grove junction** at `(−650, −650, 2)`. The 80 m maximum junction reservation is a planning allowance; lane operation and vehicle turns are not accepted.

The longer W2 approach also introduces a separate, explicit **RD09 underpass** at `(−215, −250)`. The roads do not connect there. Its centerline gap is 9.25 m, while clipping the complete road footprints and emitted surface triangles gives a minimum soffit-to-road-top gap of **8.737755597 m**. That minimum occurs at approximately `(−225.244888059, −238)`. This on-land separation does not alter the 20 m requirement over water. Vehicle headroom, supports and actual engine traversal remain unverified.

Every selected or conditional programme receives an actual candidate access route and a whole parcel reservation. The register contains **19 programmes on 18 parcels**. Programme 017 is hosted within the Showcase parcel rather than becoming another unrelated lot. Views 018 and 020 share their existing venue/backstage hosts. All 21 view identities and all four conditional programme states remain intact. Public names use the established neutral R05 card labels.

Parcel area totals **701,500 m²**, including outdoor, circulation and landscape reservation. This is neither floor area nor a count of new buildings. The rectangles establish reviewable land take; final shells, detailed entries, rooms, service loading and reuse placements remain open.

The optional RC-A-01 seam road is not built in this hypothesis. The Sunset loop and explicit access spurs already serve the arrival/café cluster. The source reservation remains preserved for comparison. The shared northern seam is a work boundary across continuous land at the same elevation, not a coast, cliff or server boundary.

## Native Crown comparison conflicts

Native roads and footprint proxies are retained at scale 1 in a separate historical comparison layer. Choosing their coast as a scenario does not accept their current placement or convert every proxy into an existing asset.

The three straight connection bands intersect these historical proxy footprints in plan:

| Candidate band | Historical proxy | 2D overlap |
|---|---|---:|
| W1 | H11 | 133.6 m² |
| W1 | M09 | 320.76 m² |
| W1 | M13 | 609.15 m² |
| W2 | S01 | 312 m² |
| W2 | V03 | 139.603364 m² |
| E1 | S01 | 1,488 m² |

These are explicit review conflicts. No historical proxy has been silently moved or resized, and no actual current-engine collision is inferred from a historical footprint. The build/audit register also checks the actual Crown connecting roads and junction geometry. A later reuse decision must select exact current asset revisions and resolve placement conflicts individually.

## Southern island access

The entire southern island remains a separate nature reservation. A proposed water route from the Grove marina reaches a shore-transfer reservation, followed by a short pedestrian path. The water route avoids the candidate land interiors. Its berth, gangway, depth, vessel dimensions and actual engine traversal remain unverified.

This island has **no road bridge** in the candidate. Mainland, Crown and E1 road connectivity must not be reported as road connectivity for every island.

## Review result and remaining evidence

The source/design checks established whole-parcel containment, full-width flat-road containment, no parcel/road overlap, explicit intersection nodes, source identity retention and complete fold reservations. The independent audit records those checks against the exact contract hash. Builder-generated junction cores, cap carving and meshes have their own subsequent checks.

R07 is a complete proposed foundation candidate for isolated import and review. It is not a release to replace the current world. Decisions now concern concrete geometry: regional size and shape, chosen Crown context, W1/W2 spacing, compact E1 descent, Grove junction, individual programme/host parcels and native asset conflicts. Actual engine controls, water datum reconciliation, walk/drive/boat traversal, collision, streaming, saved model captures and creator acceptance still require returned evidence.


## Current marina-water amendment
The marked marina is now cut out of LAND-WEST and its water exclusion. Five pedestrian nodes follow the north/east quay; vehicle roads and parcels are unchanged. Baseline notes above are historical where their coastline differs. Exact shore shape and docks remain proposed; no native/world acceptance.
