  "confirmed_requirement": {
    "clear_height_m": 20,
    "scope": "Both District3 bridges in the creator decision; final mapping to W1/W2/PED/E1 remains unresolved.",
    "pedestrian_switchbacks_at_each_end": true
  },
  "baseline_assumptions": {
    "navigation_high_water_z_m": 0,
    "additional_clearance_margin_m": 0,
    "deck_structure_depth_m": 2,
    "landing_z_A_m": 2,
    "landing_z_B_m": 2,
    "navigation_opening_width_m": 100,
    "road_approach_reservation_width_m": 24,
    "road_entry_transition_length_m": 60,
    "road_exit_transition_length_m": 60,
    "road_transition_model": "Grade varies linearly between0 and maximum grade; illustrative vertical-profile allowance, not a selected speed-based road standard.",
    "available_site_run_m": null,
    "shoreline_chainages_m": null,
    "bridge_skew_degrees": 0,
    "warning": "The100m opening and zero skew are study assumptions. A skewed crossing needs projected opening geometry, navigation alignment and longer spans. A zero extra margin models the bare requirement, not a chosen engineering margin."
  },
  "road_scenarios": [
    {"id":"SW-FND-ROAD-04","grade_pct":4,"landing_z_A_m":2,"landing_z_B_m":2,"role":"gentler comparison"},
    {"id":"SW-FND-ROAD-05","grade_pct":5,"landing_z_A_m":2,"landing_z_B_m":2,"role":"recommended first local feasibility specimen; not chosen final bridge"},
    {"id":"SW-FND-ROAD-06","grade_pct":6,"landing_z_A_m":2,"landing_z_B_m":2,"role":"space-pressure comparison"},
    {"id":"SW-FND-ROAD-07","grade_pct":7,"landing_z_A_m":2,"landing_z_B_m":2,"role":"historical-steepness comparison; not preferred"},
    {"id":"SW-FND-RAISED-A","grade_pct":5,"landing_z_A_m":10,"landing_z_B_m":2,"role":"one raised arrival; assess podium/terrain cost and building conflicts"},
    {"id":"SW-FND-RAISED-AB","grade_pct":5,"landing_z_A_m":10,"landing_z_B_m":10,"role":"both raised arrivals; impact comparison only, no D2 change authorized"}
  ],
  "pedestrian_switchback_assumptions": {
    "grade_pct": 5,
    "clear_width_m": 3,
    "gap_between_parallel_runs_m": 1,
    "maximum_rise_between_level_rests_m": 0.75,
    "inline_level_rest_length_m": 1.8,
    "end_turn_platform_depth_m": 4,
    "parallel_run_counts": [6,8,10,12],
    "stacked_overlapping_runs": false,
    "warning": "Planning dimensions only, not an accessibility-code claim. Side-by-side folding avoids assumed stacked-headroom clearances; railings, columns, foundations, drainage, approach transitions and envelope setbacks are additional."
  },
  "site_acceptance": {
    "selected_scale": null,
    "selected_topology": null,
    "selected_approach_solution": null,
    "accepted_endpoints": null,
    "available_parcel_footprints_m": null,
    "navigation_vessel_envelope": null,
    "engine_acceptance": null
  }
}