{
  "id": "SW-R02-PLANNING-ACCEPTANCE-20261019",
  "layout": {
    "path": "docs/sw-source-layout/R02/GROUND_PLAN.json",
    "bytes": 294678,
    "sha256": "a8ab6632904bf322cb97751712c199703fc99b772e193927ed8772c6ca0ebfbf",
    "revision": "P1 / R02",
    "saved_commit": "62fc088ad71c79ea93b8719cc267f6a04ef341e6",
    "arrangement_acceptance": "PLANNING_ACCEPTANCE.json",
    "frame_acceptance": null
  },
  "status": "arrangement_accepted_for_planning",
  "evidence": "Legend, relayed in trusted parent instruction: “That R02 ground plan is fine. Just want a scale of dev like some of the 9 mini zones in phases build wise. %05 needs to be finished and live”",
  "interpretation": "%05 means District Protocol R05 in the preceding discussion.",
  "accepted": "Saved R02 planning arrangement; not a finished visual deliverable or a measured construction blueprint.",
  "not_accepted": [
    "metric calibration, orientation and study frame",
    "detailed ground, shoreline, grades and sections",
    "Crown connection/world alignment and shared water datum",
    "native shell/POI-host mappings and selected interior fit",
    "whole-scope construction-reference completion",
    "actual world integration, collision/navigation and walk/drive playtest"
  ],
  "phase_schedule": "Proposed; no new SW dispatch or Quik work.",
  "original_record_note": "Original R02 status/labels record its pre-acceptance state and remain preserved. This record supplies the later scoped acceptance."
}
