# Crown Landmark — working handoff R01

**For Asa / Legend and Quik · PI-BLD-0001-V01 · 16 October 2026**

This is the first consolidated coordination handoff for the current Crown Landmark. It combines the unchanged exterior R06 and interior R02 reference packs with current Building R05 records, source checks and the next modeling assignment.

**Current stage: reference coordination prepared; shell fit and engine acceptance pending.** No exterior shell is certified by this release. The new OBJ is a source-coordinate review rig, not a finished shell or production model.

## Start here

1. Read [the current handoff cover](COORDINATION/START_HERE.md).
2. Review [the task board](COORDINATION/TASK_BOARD.csv) and [Quik's modeling work order](COORDINATION/QUIK_WORK_ORDER.md).
3. Inspect [L25](COORDINATION/SPATIAL_REVIEW/L25_Fit_Review.svg) and [L26](COORDINATION/SPATIAL_REVIEW/L26_Fit_Review.svg) floor-fit diagrams. They show the proposed rooms and the known tower-base size; the actual upper envelope remains unresolved.
4. Use the [dimension register](COORDINATION/DIMENSION_REGISTER.csv) for review, or [BUILDING_DIMENSIONS.json](COORDINATION/BUILDING_DIMENSIONS.json) for tools.
5. Read [the shell evidence search](COORDINATION/SHELL_EVIDENCE.md). The old 320 m offset-cube tower is a different design and must not be substituted for this 240 m Crown Landmark.
6. Use [the local modeling-dot assignment](COORDINATION/LOCAL_DOT_TASK.md) when the modeling environment is connected.

## What was completed

- Original exterior and interior package files are preserved byte-for-byte under `SOURCES/`.
- The current authority and primary visual references are explicit; historical R02 process instructions are superseded by the R05 cover without rewriting archived artwork or source history.
- One dimension record maps 45 proposed levels, 81 room/planning zones and 102 proposed openings. Every populated measurement retains provenance/status; measured acceptance is not invented.
- A bounded 2D preflight found no positive-area room-zone overlap and no opening-boundary alignment flags. The report does not establish clearances, accessibility or 3D shell fit.
- The upper-floor diagrams and an editable OBJ review rig are reproducible with the included Python script.
- The task board identifies owners, dependencies, evidence and the remaining acceptance gates.

## What remains before a finished building turnover

The main missing deliverable is a matching editable exterior shell and its measured fit review. Council L25 (+126 m) and diplomacy L26 (+130.5 m) need actual taper/rib checks. The core, atrium, stairs and playable clearances need modeling evidence. Final district placement and calibrated window views remain pending. Unreal import, collision, movement and performance acceptance are later checks in the actual project.

The user has authorized this Crown Landmark coordination pass. The existing district/world construction pause is not silently lifted. Work on proposed asset studies must remain clearly separated from acceptance into the authoritative world. No changes were pushed to the repo or website by this handoff operation.

## Package contents

| Folder/file | Purpose |
|---|---|
| `SOURCES/` | Both issued packs, complete and unchanged; 121 original files |
| `COORDINATION/START_HERE.md` | Current authority, scope and reading order |
| `COORDINATION/ASSET_BRIEF.json` | R05 asset and proposed interior-scope record |
| `COORDINATION/BUILDING_DIMENSIONS.json` | Dimension contract with status/provenance and unresolved values |
| `COORDINATION/DIMENSION_REGISTER.csv` | Filterable measurement register |
| `COORDINATION/REFERENCE_AUTHORITY.csv` | Controlling versus supporting references |
| `COORDINATION/SPATIAL_REVIEW/` | Two upper-floor diagrams, review rig and bounded preflight results |
| `COORDINATION/QUIK_WORK_ORDER.md` | Modeling and acceptance evidence requirements |
| `COORDINATION/LOCAL_DOT_TASK.md` | Ready-to-use assignment for the connected modeling session |
| `COORDINATION/QA_REVIEW.md` | Independent coordination review findings |
| `MANIFEST.json` | SHA-256 hashes for all other package files |
| `COORDINATION/PROTOCOL_SOURCES/` | Current workflow text/pointer and production decisions excerpt |

No original R06/R02 source is renamed, removed or replaced. Coordination R01 is a separate release identity; it does not renumber the building or imply new artwork approval.
