# Crown Landmark — coordination cover R01

**Asset:** PI-BLD-0001-V01 · Crown Key / D02  
**Prepared:** 16 October 2026  
**Release status:** audited reference sources with a proposed coordination work plan. Shell acceptance, completed production model and engine acceptance are not evidenced by this package.

This cover accompanies the unchanged EXT_R06 and INT_R02 sources. It does not issue a new exterior or interior design revision or approve proposed dimensions.

## Read this before the historical instructions

The current process authority is **Building Protocol R05**, with **District Protocol R04** for district coordination and **Spatial Imagery R01** for model-based view work. The bundled [R05 guide](PROTOCOL_SOURCES/Building_R05_GUIDE.md) explains this release; [R05 consolidated text](PROTOCOL_SOURCES/Building_R05_CONSOLIDATED.txt) is the normative building workflow. Verify the repository current pointer before execution: [current protocol set](https://github.com/215GrandAve/lost-souls/blob/main/production/protocols/current.json), [building guide](https://thelostsouls.world/protocols/building/), [spatial imagery guide](https://thelostsouls.world/protocols/spatial-imagery/).

For this handoff, this cover takes precedence over source statements that Protocol R02 governs, or that older city-baseline wording establishes current metric placement. Current repository decisions and the current protocols take precedence over this cover. Historical R01/R02 labels and source instructions remain intact for provenance; they are not new approvals. Any active foundation/construction hold remains in force until its recorded release. Preparing this work order does not release a hold.

## Open in this order

1. [Reference authority](REFERENCE_AUTHORITY.csv): which reference controls which question.
2. [EXT modeling brief](../SOURCES/PI-BLD-0001-V01_CrownLandmark_EXT_R06/04_Handoff/MODELING_BRIEF.txt) and [metric design targets](../SOURCES/PI-BLD-0001-V01_CrownLandmark_EXT_R06/05_ScaleAndPlan/PI-BLD-0001-V01_CrownLandmark_EXT_R06_DesignTargets.json): exterior intent and proposed first-blockout dimensions.
3. [INT overview](../SOURCES/PI-BLD-0001-V01_CrownLandmark_INT_R02/00_READ_FIRST/PI-BLD-0001-V01_CrownLandmark_INT_R02_Overview.pdf), [editable layout notes](../SOURCES/PI-BLD-0001-V01_CrownLandmark_INT_R02/06_Handoff/EditableLayout/README.txt) and [open decisions](../SOURCES/PI-BLD-0001-V01_CrownLandmark_INT_R02/06_Handoff/OPEN_DECISIONS.txt): room appearance, technical proposal and remaining coordination.
4. [Task board](TASK_BOARD.csv) and [Quik work order](QUIK_WORK_ORDER.md): evidence to produce and review gates.

## What can be relied on now

The archived files are readable. The source manifests' 22 EXT image hashes and 88 INT file hashes matched during this audit. INT provides 25 perspectives, eight vector planning sheets, 81 room zones, 102 door records and 25 proposed cameras. These counts demonstrate available reference coverage, not completion of 81 modeled rooms.

The exterior's authored targets are 240 m overall height and a 160 × 120 m foundation. They remain **proposed for shell testing**. The interior JSON and SVG plans are editable design proposals. Its OBJ contains planning zones and wall ribbons, not a joined production model. Materials are look targets; production meshes, texture maps, UVs, collision, LOD/performance results and engine acceptance are not supplied here.

## Completion gates

- **Reference handoff:** current authority, source versions, scope, proposed dimensions and open decisions are explicit; all links and manifests resolve.
- **Shell and layout acceptance:** one identified editable shell supports measured elevations and sections, room-fit checks and recorded design decisions. Acceptance requires evidence and named reviewers.
- **Engine acceptance:** Quik or the assigned engine owner verifies import, dimensions, movement, collision, materials and agreed performance requirements in the target environment.

A reference handoff can be delivered with an explicit unresolved shell work list. It must not be labeled a finished, engine-ready building. Use the accepted Crown Landmark structure as the repeatable pack template; select subsequent buildings by scope and available evidence rather than matching this building's image count.
