PARADISE ISLAND ASSET HANDOFF CHECKLIST R05

Asset ID: __________
Scope and revision: __________
Release status: __________
Reviewer and date: __________

[ ] Asset ID, scope and revision agree across filenames and documents.
[ ] One controlling master and explicit priorities resolve conflicting angles.
[ ] Each selected role is supplied or records combined coverage, a reused kit, deferral or not-applicability; unresolved work remains open.
[ ] Scale fields and enterability are recorded with clear approval status.
[ ] Core architecture is visible without vegetation or scene clutter.
[ ] ZIP opens, all files exist, image hashes match and the change log is accurate.
[ ] Approved image numbering is retained; added or replaced roles are explained.

SHELL REVIEW
[ ] One mesh produces all definitive views.
[ ] Metric bounds, floor levels, orientation and parcel fit reviewed.
[ ] Accepted design differences logged.

INTERIOR REVIEW WHERE APPLICABLE
[ ] Scope tier, distinct playable rooms and planned unique perspective count recorded.
[ ] Coverage resolves modeling/gameplay needs; image ranges are guidance, not quotas.
[ ] Repeated rooms/floors link to approved kit IDs, revisions and instance coverage.
[ ] Primary build list and supporting images are identified.
[ ] Dimensioned plan, units, orientation and room/kit schedule supplied.
[ ] Sections/access diagrams supplied where vertical relationships or routes need them.
[ ] Technical drawings and duplicate boards/masters excluded from perspective counts.
[ ] Window backgrounds labeled neutral temporary, concept or verified model view.
[ ] Final site-view integration tracked separately from interior layout approval.
[ ] Plans and room IDs connect to the reviewed shell, or explicitly identify the proposed layout pending shell review.
[ ] Every selected reverse view depicts the same room as its controlling view.
[ ] Windows, doors, ceiling levels and circulation fit the shell.
[ ] Story locations identify their source and approval status.

ENGINE RELEASE
[ ] Editable source, exports, materials and textures supplied.
[ ] Collision and player routes checked in project.
[ ] Shading, UVs, texture paths and performance reviewed.
[ ] Approval and remaining work recorded.


15 OCTOBER RELEASE CHECKS
[ ] Current family/revision resolved through current.json.
[ ] Required aerial/orbit and measured-view coverage indexed.
[ ] Dimensions, clear room sizes and shell/core fit reviewed at recorded status.
[ ] Shared frame and both ends of neighbor connections reconciled.
[ ] Developer / base shell / kit / appearance / placement identities recorded.
[ ] Package inventory, files, hashes, revisions and ZIP integrity verified.
[ ] Current engine commit/map inspected; source footprints are not claimed as built models.
[ ] Launcher and multiplayer capacity remain unverified until measured tests pass.
