PI-BLD-0001-V01 - CROWN LANDMARK EXTERIOR DESIGN HANDOFF / R06 APPROVAL Asa approved the R05 exterior design handoff and the reusable exterior-first workflow. R06 applies the five requested handoff refinements. The approved master, three boards and twelve individual images are retained unchanged. The tall master and front image establish Crown Landmark's visual baseline. REFERENCE AUTHORITY Overall silhouette: original tall master + 01_Front. REAR: 02_Rear is the authority, including its central crossed gold treatment. The continuous blue-glass rear panel in B02 is SECONDARY COMPARISON ONLY. Use the 02_Rear treatment in the blockout; do not combine the two rear designs. B02 remains the primary side-profile overview. B01 is oblique comparison. The master/front establish scale proportions when supporting angles differ. 07_ElevatedCrown preserves the tall perspective. It is not a vertical top view. 13_RoofFootprintPlan supplies the new true-overhead schematic baseline. B03 and the four D01-D04 standalone crops supply tight exterior details. EXTERIOR DESIGN Preserve the tall pointed crown, long curved blue-glass tower shaft, sweeping ivory ribs, champagne-gold mullions and narrow gold-lit front atrium. Preserve the grand entry arch, small curved glass canopy, three stepped podium terraces, arcade openings, blue-glass parapets and shallow oval rib-foot basins. DESIGN TARGETS FOR THE FIRST BLOCKOUT Total height: 240 m, finished ground to tallest crown tip. Foundation footprint: 160 m wide x 120 m deep. Podium decks: +18 / +36 / +54 m. Deck footprints: 145 x 106 / 125 x 90 / 105 x 76 m respectively. Tower-body envelope at +54 m: 68 x 54 m. Occupied floor organization: 45 levels - 9 podium + 36 tower. Podium spacing: 6.0 m; 9 intervals reach +54 m. Tower spacing: 4.5 m; 36 intervals reach the +216 m roof. Crown zone: +216 to +240 m; 24 m of structural crown/roof height. Entrance arch: 18 m wide with 14 m clear height. Entrance portal within arch: 8 m wide with 4.5 m clear height. Central lobby can omit intermediate slabs to maintain its tall atrium. These authored targets are internally consistent and ready for blockout testing. The scale card, overhead schematic and DesignTargets.json describe one system. The six principal rib paths and crown-tip targets are documented in the plan; secondary crown fins and ornament follow the master. No parcel coordinate or district placement ID is assigned in this pack. ENTERABILITY Production target: SELECTED ROOMS ENTERABLE. Plan the lobby/arrival space, elevator/stair core, connecting corridors and signature suites as playable spaces. The interior pack defines the exact room program after shell review. Other occupied levels may use facade/interior representation appropriate to their gameplay use. MODELING ORGANIZATION Separate massing, crown/ribs, curtainwall, podium slabs/arcades, parapets, entrance/canopy and water basins into useful editable objects/material groups. Use PI-BLD-0001-V01 consistently; R06 identifies this reference pack revision. Printed R01 labels on supplied boards identify historical source editions. Do not change V01 merely because a camera/reference-pack revision changes. FIRST BLOCKOUT REVIEW Submit one basic shell with front/rear/left/right, vertical overhead and elevated views from the same mesh. Check height, footprint/depth, three podium decks, principal crown/ribs, rear authority, entrance clearance and circulation space. Keep this review short; the exterior does not need finished materials/details. Resolve shell dimensions and core positions before the interior design pack. SEQUENCE Exterior design pack -> basic shell/blockout -> interior layout/design pack -> detailed modeling -> in-game review. INTERIOR SCOPE Standardize coverage rather than a fixed image count: floor plan + section; lobby wide + reverse; entrance looking inward/outward; elevator/stair core + corridor; typical occupied room; signature story room when applicable; ceiling, materials, lighting and fixtures. Connect every interior to the agreed shell. TECHNICAL INTEGRATION Vegetation remains separate. No rough procedural scale-study model is included. Final topology, UVs, collision, LODs, streaming/performance and engine integration are later production checks. This handoff is enough to begin the exterior shell.