PI-BLD-0001-V01_CrownLandmark_INT_R02 VIEW CORRECTION REVISION - 13 October 2026 The approved city layout remains the working baseline. Interior development can continue now; exact city scenery can be connected to each window later. 11 images revised: 8 upper-floor views use neutral daylight, 2 lobby/entrance views correct reflective rear core panels, and 1 hospitality view removes an incorrect ground-floor ocean backdrop. The other 14 perspectives are unchanged. Neutral daylight is a temporary presentation backdrop. It does not specify frosted glass, an opaque window material, fog, or permanently blocked views. Keep clear glazing in the model; render the exterior separately when ready. Start with the R02 Overview PDF and 06_Handoff/VIEW_CORRECTIONS_R02.csv. Use R02 room masters and individual views for appearance. Technical geometry, plans, room/door/camera schedules, materials and source baselines are retained from R01, with their R01 identifiers intact. No dimensions or floor assignments have been changed in this views-only revision. This is a visual design reference pack, not a finished 3D model or verified site-view study. Retained ground/podium scenery and revised hospitality planting are plausible concept context, not exact district renderings. For final scenery, use one approved city scene and the actual room position, floor height, camera direction and neighboring-building occlusion. Do not move the approved city to fit a window image. Later plan changes can be handled as a targeted revision. R01 remains available separately. R02 supersedes its image backgrounds where listed in the correction register. Eight vector sheets, the editable planning JSON/OBJ and schedules remain the same authored layout proposal as R01.