R02 OVERRIDE: Approved city layout remains baseline. Use R02 image masters.
Neutral backgrounds do not change glass materials or final sightlines.
R01 native drawings and technical schedules remain unchanged.

1. Protocol R02 + accepted owner directions govern process and geography.
2. EXT R06 targets and front/master govern shell; 02_Rear governs rear.
3. This INT JSON and native drawings control proposed dimensions/connections.
4. Room masters control appearance: lobby 01, hospitality 13, council 15, diplomacy 19.
5. Individual shots control local material/detail roles; reverse shots are supporting.
6. Browsing boards and aerial context are secondary. Do not measure from perspectives.

Known reconciliation items: council table/observer blocking is fixed by schedule;
three passenger doors govern core; resolve pendant scale by section; proposed
facade windows must be checked against taper and rear rib treatment. L00 rear blue
panels above the core are interior/reflection surfaces. Context cannot fix compass
orientation without the district transform.
