# Crown Key V4 — site-finish concept R01

A restrained public-realm layer connects the resolved Crown precinct and the southern pavilion/arcade waterfront. Existing architecture, reservations and island infrastructure remain fixed. This is a reversible presentation concept for visual review.

## What changed

- Warm limestone aprons and short pedestrian edges establish a ground relationship around Crown, the two western rectangular towers, Twist Compact and Frame Mid. Short Crown approach links indicate possible connections; their endpoints do not establish entrances or a walkable route.
- A shared waterfront walk and related lawn/low-bed edges connect U07's pavilion court toward U15's single arcade. The open remainder, both commons and all unresolved plots stay undeveloped. No second arcade, quay, seawall or destination was added.
- The previous 48 optional prototype palms are retained but hidden in this revision. Twenty-two deliberately stationed broad-canopy trees provide small shade/framing groups. Failed stations were omitted; none were randomly relocated to fill the site.
- Cloned glass shaders give a lighter cool response while retaining the original façade geometry. Water uses a narrower color transition and restrained two-scale normal variation. These are shader changes, not water displacement, bathymetry or shoreline works.

The new collection has 51 surface patches and 22 trees. Geometry and material changes can be applied or reverted separately from the untouched baseline. The existing sun, sky, exposure, color management and cameras are retained exactly.

## How to read the images

The proof retains the PRESENTATION-R01 western aerial camera. Its emphasis is Crown and the resolved western architecture; it does not show the southern U07/U15 precinct. The companion north-up overview includes that waterfront treatment, both commons and every architectural group ID. Pale stone is conceptual pedestrian hardscape; sage patches are lawns; dark olive strips are low beds. Teal reservation masses remain explicit placeholders, not completed buildings.

The comparison uses the original PRESENTATION-R01 after image as its before, copied unchanged. One lower-resolution technical sample preceded a full aerial/overview batch. That batch exposed dark joins from duplicate coplanar paving faces. A bounded technical correction removed the overlap while preserving the same hardscape coverage, palette, cameras and lighting; the same two views were then rerendered for delivery. The initial batch is diagnostic evidence, not an alternative design. There was no image generation, style batch, camera search or new building authoring.

## Preservation and fit evidence

`work/PRESERVATION-AND-FIT.json` records a fresh comparison of the saved new scene against the saved baseline: native node matrices, vertex/face/UV data, mesh material lists and group bounds, plus cameras, lights, world and exposure. It also checks actual saved new mesh projections against the fixed coast, road/bridge surfaces, architecture, reservations and commons. New surfaces are inset from these constraints; all levels are schematic display offsets. Small Blender float-storage differences in new surface triangulation are reported separately from obstacle clearances. `work/COPLANAR-JOIN-REPAIR.json` documents the duplicate-face correction and coverage preservation; no source architecture was modified for it.

`work/REVERSIBILITY-TEST.json` records a separate baseline reload and apply/revert check. `DELIVERY-CHECKS.json` records image, source and archive-related checks. R02 native asset identity, delivery QA and original placement/fit findings are inherited; they were not re-audited or represented as newly verified. Source hashes and exact inherited architectural transforms accompany this revision.

All 16 modeled groups, ten reservations, seven Phase 1 records, 26 IDs, 336 coastline vertices, 13 road records and three bridge corridors are retained. There is no relocation, scaling, architectural mesh change or new construction order.

## Remaining decisions and limits

- Review the scale and continuity of the pale pedestrian edges, the modest Crown approach areas and the pavilion/arcade garden connection. Approach endpoints, road crossings, canopy facing and useful access are unresolved; no accessible route, grading, drainage, foundation or engineering approval is implied.
- Ten reservation identities/siting decisions remain open. Tall/Slim correspondence, U12/U13 relocation, U14/U16 identity and hotel siting/support remain unchanged. U05 remains provisional; the lower native Garden Canyon and single Long Arcade retain their accepted working direction only.
- This remains a scene-based concept, not high-end finished landscape visualization. The flat base, simple shore/road edges, low-detail tree foliage and limited glass environment/interior response remain visible. Surface joints and plant species are schematic. The inherited nonphysical road/bridge shadow workaround remains unchanged and is documented in the baseline.

Planning units assume source metres; world registration and all elevations remain unverified. No Unreal playability or access tests were run. No merge, deployment, QC project edit or final placement is authorized or performed.

## Model and renderer record

The collaboration tool confirmed dispatch of `gpt-6-astra` with `xhigh` for this bounded art-direction/visual-review task, and `gpt-6.1-sol` with `high` for mechanical assembly/checks. The primary runtime setting and actual token usage were not exposed. No token or cost estimate is provided. Direct rendering uses Blender 4.5.1 LTS / Cycles CPU with one inherited late-afternoon setup; exact settings and per-render records are included.