# Independent review · production run R01

Astra subagent `release_review` reviewed the frozen Split and Terrace contracts, final derived geometry and clean drawings separately from their authors. **Pass for proposed design review; not build-ready.** Exact contract hashes, checks and held gates are in [REVIEW.json](REVIEW.json).

Both packets have 14-page primary drawing sets. Split has one enclosed gallery bridge and nine saved neutral views. Terrace has a connected L00 lobby, furnished studio, residents lounge and outdoor thresholds, plus thirteen neutral views. The reviewer rechecked the corrected Terrace bath route with independent 2 cm sampling. All four proposed paths clear its 0.55 m envelope after correction.

Split still requires a real ground-to-gallery vertical transport solution. Both require creator design/scale decisions, detailed exterior and finish reconciliation, operating doors and Quik's real import/player/collision/camera evidence. Site placement remains unknown. The verified next-building buffer is **0**.

The material-only library writer uses libraries.write with the created materials; its final data/script manifest passed independent review. Blender execution, baking, real prop meshes and mesh assignments remain untested or undelivered. These are candidate review findings, not construction or runtime acceptance.