# PI-BLD-0010-V03 · Corner Arcade · exterior candidate R01

**Editable exterior candidate, proposed dimensions; not build-ready or engine verified.**

Two-storey L/corner frontage with public arcades on two arms and a smaller upper pavilion set back from the corner.

## Files and use

`candidate-input.json` controls reproducible authoring. Shared batch generator emits model JSON, OBJ/MTL, GLB, Blender rebuild script, orthographic sheets and neutral views. Use its emitted manifest to identify files actually delivered; this note does not claim a `.blend` was run or a geometry-only export was engine tested. `MATERIAL_SCHEDULE.json` maps provisional slots to the existing shared material IDs. `SOURCE_REVIEW.json` records source hierarchy, discrepancies and false acceptance gates.

## Controlling reference

Catalog card row3 column1 controls the returning side frontage and large corner arch. Waterfront arcade image provides family material and arch-language context only.

Viewed source: uploaded `22-Crown_Key_Final_Card_Set.zip`, `03_Low_Rise_and_Public_Global_IDs.png`. Source card says **not to common scale**. Width 46 m × depth 34 m × height 12 m and 2 floor(s) are proposed candidate inputs; they are not measured from the card. The envelope does not establish final shell/structure or world placement.

## Entrance and retained interior scope

Corner arrival must connect both public arms. Place one enclosed vestibule/shop behind the corner and the service room on its back side without blocking either arcade arm.

R02 retained program: Covered arrival and enclosed shop vestibule; Shop or cafe bay; Back room / service space. Exterior production does not mark these interiors complete. No new named Atlas scene assignment is introduced.

## Quik build sequence

1. Set two arcade arms and independent end conditions; do not duplicate a straight elevation around a solid corner.
2. Develop corner springing/arch meeting and shared support logic.
3. Keep the upper setback pavilion subordinate to the two-storey corner.
4. Fit corner vestibule/shop and rear service room with door swings and delivery path.
5. Sweep both public approaches and the return route after actual geometry authoring.

## Known differences and review

Right-angle return is a plan hypothesis for the perspective card; exact included angle and curved corner transition remain to be reviewed. A simple L mass is not an accepted reconstruction.

Keep current source artwork and this proposed contract separate. Check hero, rear, entry eye-level and defining detail against the source; resolve roof/facade continuity and provide a real opening/circulation proof. Blender reopen, independent shell review, collision, Unreal import, navigation, lighting and performance are pending. No collision proxy or triangulated export alone establishes acceptance.

Owner: Marley / Codex / delegated hospitality exterior session. Root coordinator publishes consolidated checkpoint and site evidence.
