# Terrace T01 defect and gap list (CLAUDE1, from the Blender run)

Status: all items are open. Severity: **D** needs a design decision, **A** author input missing, **K** kit/material gap, **T** tool/pipeline note.
IDs are local to this package.

| ID | Sev | Finding | Needed from |
|---|---|---|---|
| T01-C01 | D | `BATH_SHOWER_TRAY` is a 1.2 × 1.0 × 0.06 m tray. Kit prop CK_PROP_P023 is a 0.9 × 0.9 × 2.2 m enclosure with glazing. The package builds the tray only: there is no enclosure, no glazing and no door. Route R04 ends 0.60 m from this tray, a clearance of 0.05 m beyond the 0.55 m body model. A real enclosure would be solid up to 2.2 m at that edge. | Terrace author (OA3) |
| T01-C02 | A | Prop facing is not stated anywhere in the contract. Each prop's front faces its room centre, bath fixtures face the bath centre, terrace planters face the lounge. All 19 facings are assumptions (per-prop in `AUTHORED_MANIFEST.json`). | Terrace author |
| T01-C03 | A | The kit specifies `wall_back_bottom_center` for the wardrobe, kitchenette and vanity. The contract states no wall-back reference, so all props use `floor_center` at the proxy centre. Positions are identical; only the pivot convention differs from the kit. | Kit owner / Terrace author |
| T01-C04 | D | All 19 props are named T01 variants because every proxy footprint or height differs from the kit's proposed bounding box. Largest gaps: kitchenette height 0.92 m vs 2.1 m (no upper units in the proxy), reception desk +0.40 × +0.35 m, bench +1.1 m long, lounge sofas +1.2 m long, planters 0.6 → 0.75 m tall and 0.6 m → 1.4–1.9 m deep, shower 2.14 m shorter. Kit sizes are `PROPOSED_BOUNDING_BOX_NOT_MEASURED`, so either the kit or the contract needs to move. | Kit owner and Terrace author |
| T01-C05 | K | Foliage in the planters uses `CK_MAT_008_FOLIAGE_GREEN` as an added slot. Kit planter P009 lists only the ivory vessel and soil. | Kit owner |
| T01-C06 | K | Hollow rooms take one material per wall object, so inner and outer wall faces share the bound plaster. The bound finishes treat them as interior finishes. Facade finish is undefined. | Terrace author / visual team |
| T01-C07 | K | Not applied (no object or no binding): lobby ceiling, bath floor (the studio slab keeps the studio floor), tower glass and bands, terrace soffits. Window glazing keeps the neutral pipeline glass, not `CK_MAT_005_GLASS_LAGOON`. `CK_MAT_012_LIGHT_DIFFUSER` is unused. | Terrace author |
| T01-C08 | K | Material bump maps are procedural in the library and are not baked. The `.glb` carries base colour, roughness and metallic only. Engine appearance is unverified. | Material owner / Quik |
| T01-C09 | T | Collision hulls are named `UCX_<proxy>_NN` and sit in `PROPS.glb` as ordinary meshes. The `UCX_` convention is Unreal's FBX convention; whether the glTF importer treats them as collision is untested, and they will render if imported as plain meshes. | Quik |
| T01-C10 | T | The pipeline's glTF round trip resets Blender, so stage 2 reopens the saved stage-1 `.blend`. Not a defect in output; recorded so the order is not changed by accident. | none |
| T01-C11 | T | Prop route clearance is checked against collision-hull rectangles of each prop, not full capsule sweeps. Coverage matches Codex's centre-line model only. | Quik / OA1 |
| T01-C12 | T | Engine results do not exist: import, scale (expect 5800 × 5200 × 11030 cm), collision, NavMesh and traversal are `not_tested`. | Quik |